● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Coal & Energy Crushing Solutions

Coal & Energy: Crushing & Screening Solutions. HAMAC equipment, configuration and cost for Coal & Energy. Includes published model data and an acceptance-test checklist.

Overview

Gentle crushing to avoid fines. HAMAC designs crushing, screening and grinding circuits for coal & energy across capacities.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Scope

  • Coal (Mohs 2, ~40 MPa)
  • Bauxite (Mohs 2, ~50 MPa)

Typical flow

Feed → primary → secondary/tertiary → screening → (VSI / grinding) → stockpile.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialCoal
Mohs hardness2
Compressive strength~40 MPa
AbrasivenessLow
Recommended circuitimpact / jaw with gentle reduction
ApplicationCoal & Energy
Typical feedCoal, Bauxite
Assumed dutymine pre-beneficiation feed
Evaluation horizonthree-year view

These values are the starting point for a written proposal on coal crushing; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectiveminimal civil works
Evaluation horizonthree-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for coal crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  2. Confirm the haul-road and stockpile plan with a brownfield extension in mind before fixing conveyor lengths.
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  5. Book shipping, prepare the packing list and confirm the container loading plan.
  6. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  7. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  8. Review the crusher chamber profile with the liner supplier against Coal (Mohs 2, ~40 MPa, low abrasion).
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Whether the quoted t/h is achieved at mine pre-beneficiation feed or under ideal laboratory feed.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Control system language, telemetry and remote diagnostics availability.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Guaranteed power draw and the minimal civil works trade-off it implies.

For mine pre-beneficiation feed, give the minimal civil works line extra weight; a generic checklist will not rank the offers correctly.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages55%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts13%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

A three-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.

Mistakes that cost more than the machine

  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Buying minimal civil works on price alone and losing it in availability.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Letting the mine pre-beneficiation feed duty be defined verbally instead of in the contract.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Measure noise and dust at the operator position against the local limit.
  2. Hand over the spare-parts list, manuals and maintenance schedule.
  3. Dry-run the plant empty for the specified period and record vibration.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Calibrate the belt scale and any level probes against a known load.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Verify rotation direction on every motor before coupling.

For a rotating shift crew, run through this list twice — once with the supervisor and once without.

Coal & Energy: Crushing & Screening Solutions — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best crusher for Coal & Energy?

Gentle crushing to avoid fines.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call