● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Crawler (Tracked) Vibrating Screen TS Series Price — What You Actually Pay

HAMAC Crawler (Tracked) Vibrating Screen TS Series price ranges by model size, mobility and motor spec. Get FOB / CIF quotations and a configured plant budget within 24 hours.

Overview

The Crawler (Tracked) Vibrating Screen TS Series is offered across several model sizes. Price depends on capacity, wear-package grade, mobility (stationary, wheel or tracked) and the level of automation, not on a single list price.

Overview — HAMAC vibrating screen reference
Overview — HAMAC vibrating screen reference.

What drives the price

  • Model size and rated capacity — larger rotors / chambers cost more.
  • Mobility: stationary < wheel-mounted < tracked (tracked adds hydraulic & engine cost).
  • Motor specification and starter (soft-start / VFD) and local voltage.
  • Wear-parts grade (Mn13 / Mn18 / Mn22 / high-chrome) and spare-parts package.
  • Control system: relay panel vs PLC with remote monitoring.

Typical price brackets

Entry models for contractor use start in the low five-figure USD range; mid-size export configurations are typically six-figure; large tracked or fully automated lines are higher. Exact numbers depend on the technical specification — request a written quotation rather than a ballpark.

How to get an accurate quote

Send material, feed size, target t/h and product sizes. HAMAC returns a flow sheet, equipment list and FOB / CFR / CIF price within 24 hours.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineCrawler (Tracked) Vibrating Screen TS Series
CategoryTracked Crushing Plants
Assumed dutyseasonal road-project supply
Evaluation horizonsingle-project view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Published Crawler (Tracked) Vibrating Screen TS Series model data

Crawler (Tracked) Vibrating Screen TS Series — nominal published data
ModelTS1860TS2160
Screen deck1800 × 6000 mm, 3 decks2100 × 6000 mm, 3 decks
Max. feeding size≤200 mm≤200 mm
Capacity65–586 t/h81–720 t/h
Motor power22 kW30 kW
Feeding conveyorB1000 × 11.8 mB1000 × 11.8 m
Generator360 kW500 kW

TS1860 / TS2160 tracked three-deck screens, 65–720 t/h, for standalone screening or closed-circuit mobile plants. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectiveminimal civil works
Evaluation horizonsingle-project view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for crawler (tracked) vibrating screen ts series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  2. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  3. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  4. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  5. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  6. Sequence delivery so foundations cure while the equipment is still in manufacture.
  7. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  8. Book shipping, prepare the packing list and confirm the container loading plan.
  9. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC vibrating screen reference
From enquiry to the first saleable tonne — HAMAC vibrating screen reference.

What to verify before you sign

  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Guaranteed power draw and the minimal civil works trade-off it implies.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Control system language, telemetry and remote diagnostics availability.
  • Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the single-project review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On seasonal road-project supply, the minimal civil works objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Letting the seasonal road-project supply duty be defined verbally instead of in the contract.
  • Using one liner profile for both secondary and tertiary stages.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.

For seasonal road-project supply, protect the minimal civil works requirement explicitly in the contract documents.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Check belt tracking, chute build-up and transfer-point dust.
  3. Measure and log the as-new CSS / setting for future wear comparison.
  4. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  5. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  6. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  7. Confirm the direction and tension of every belt under no load.
  8. Dry-run the plant empty for the specified period and record vibration.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Crawler (Tracked) Vibrating Screen TS Series Price: FOB, CIF & What Drives It — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What is the Crawler (Tracked) Vibrating Screen TS Series FOB price?

FOB price varies with model and specification; HAMAC quotes FOB, CFR or CIF against your exact requirement.

Why is there no single list price?

Each plant is configured to material and capacity, so the equipment list and price differ per project.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call