● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

How to Choose a Crawler (Tracked) Cone Crusher THP Series

Step-by-step guidance for selecting a Crawler (Tracked) Cone Crusher THP Series: match material hardness, capacity and product size, then confirm chamber, liner grade and screen area.

Overview

Choosing a Crawler (Tracked) Cone Crusher THP Series starts with the rock and the target product, not a catalogue number. The steps below turn your project data into a defensible model choice.

Overview — HAMAC cone crusher reference
Overview — HAMAC cone crusher reference.

1. Start with the material

  • Hard, abrasive rock (granite, basalt, quartz): compression crushing, premium Mn liners.
  • Soft rock (limestone, marble, dolomite): impact crushing for shape at lower cost.
  • High silica (river pebble, quartz): plan VSI + wear budget.

2. Size to saleable t/h

Add 10–20% surge to nameplate capacity; undersizing is a permanent bottleneck, oversizing wastes capital.

3. Match the product grading

Product size and shape (flakiness index) decide chamber and screen deck setup.

Pre-order checklist

  • Feed size and max lump.
  • Required t/h and product fractions.
  • Site power (voltage / frequency) and mobility need.
  • Local standards (CE, GOST, etc.).

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineCrawler (Tracked) Cone Crusher THP Series
CategoryTracked Crushing Plants
Assumed dutydemolition and recycling duties
Evaluation horizonthree-year view

Use the table as a checklist when comparing quotations for crawler (tracked) cone crusher thp series — a lower price often means one of these parameters was quietly reduced.

Published Crawler (Tracked) Cone Crusher THP Series model data

Crawler (Tracked) Cone Crusher THP Series — nominal published data
ModelTHP200THP300THP400
Cone crusherTHP200THP300THP400
Max. feeding size150 mm200 mm260 mm
Minimum outlet16 mm10 mm20 mm
Motor power160 kW220 kW280 kW
Return screenYK1500×3800YK1600×4000YK1500×3800
Generator320 kW500 kW500 kW

THP200 / THP300 / THP400 tracked cone crushers for secondary hard-rock crushing, 150–260 mm feed and 160–280 kW crusher power. Read the table column by column against demolition and recycling duties: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for an existing quarry bench in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivesimple operator maintenance
Evaluation horizonthree-year view
Site conditionan existing quarry bench
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for crawler (tracked) cone crusher thp series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

Project profile these notes assume — HAMAC cone crusher reference
Project profile these notes assume — HAMAC cone crusher reference.

From enquiry to the first saleable tonne

  1. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  2. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  3. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  4. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  5. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  6. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign

  • Closed-side setting range and whether automatic setting regulation is included.
  • Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Dust and noise control designed to the local emission limits for your market.
  • Local service partner, technician travel time and visa requirements for your market.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Control system language, telemetry and remote diagnostics availability.
  • Decommissioning or relocation value at the end of a three-year horizon.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Letting the demolition and recycling duties duty be defined verbally instead of in the contract.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.

For demolition and recycling duties, protect the simple operator maintenance requirement explicitly in the contract documents.

Commissioning checklist

  1. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  2. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  3. Hand over the spare-parts list, manuals and maintenance schedule.
  4. Check lubrication levels, grease lines and oil cooler operation.
  5. Measure and log the as-new CSS / setting for future wear comparison.
  6. Sample each product fraction and compare with the specification.
  7. Measure noise and dust at the operator position against the local limit.
  8. Verify rotation direction on every motor before coupling.

On an existing quarry bench, allow extra time for the dust and noise measurements.

How to Choose the Right Crawler (Tracked) Cone Crusher THP Series — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Which Crawler (Tracked) Cone Crusher THP Series model fits a 100 t/h granite plant?

Typically a primary jaw plus a cone in the secondary stage; exact model is confirmed from feed size and product spec.

Stationary or mobile?

Mobile when the site moves or grid power is unavailable; stationary for permanent high-tonnage lines.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Do you build plants for demolition and recycling duties?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call