● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PF Impact Crusher for Malaysia

PF Impact Crusher supplied to Malaysia: published model data, 415V 50Hz motors, SIRIM documentation and delivery to Port Klang. HAMAC factory quotation.

Overview

This page brings together the published PF Impact Crusher model data and the practical details of importing it into Malaysia — power supply, standards, shipping and commissioning. Popular feed materials in the market include Limestone, Granite.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published PF Impact Crusher data

PF Impact Crusher nominal technical data
Published parameterNominal value
PF-1007Φ1000×700 mm 400×730 mm
PF-1010Φ1000×1050 mm 400×1080 mm
PF-1210Φ1250×1050 mm 400×1080 mm
PF-1214Φ1250×1400 mm 400×1430 mm
PF-1315Φ1320×1500 mm 860×1520 mm
PF-1520Φ1500×2000 mm 830×2040 mm

Local conditions in Malaysia

  • Destination port: Port Klang.
  • Site supply: 415V 50Hz.
  • Standards: SIRIM.
  • Common materials: Limestone, Granite.
  • Region: Asia.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Port Klang, sets motors and starters to 415V 50Hz, and supplies the certificate set applicable to SIRIM. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portPort Klang
Site supply415V 50Hz
Local standardsSIRIM
RegionAsia
Machine linePF Impact Crusher
CategoryImpact Crusher
Assumed dutymanufactured-sand production
Evaluation horizonsingle-project view

At manufactured-sand production, the ranking of these parameters changes: tight grading compliance usually becomes the deciding constraint rather than the headline tonnage.

Published PF Impact Crusher model data

PF Impact Crusher — nominal published data
ModelRotor sizeFeed openingMax. Feeding sizeCapacityMotor PowerWeightOverall dimension
PF-1007Φ1000×700 mm400×730 mm300 mm30-70 t/h37-45 kW12 t2330×1660×2300 mm
PF-1010Φ1000×1050 mm400×1080 mm350 mm50-90 t/h45-55 kW15 t2370×1700×2390 mm
PF-1210Φ1250×1050 mm400×1080 mm350 mm70-130 t/h110 kW17.7 t2680×2160×2800 mm
PF-1214Φ1250×1400 mm400×1430 mm350 mm100-180 t/h132 kW22.4 t2650×2460×2800 mm
PF-1315Φ1320×1500 mm860×1520 mm500 mm130-250 t/h220 kW27 t3180×2720×2620 mm
PF-1520Φ1500×2000 mm830×2040 mm700 mm300-550 t/h315-400 kW50.6 t3959×3564×3330 mm
PF-1620Φ1600×2000 mm2000×1600 mm500 mm400-700 t/h400-500 kW58 t4259×3660×3450 mm
PF-1820Φ1800×2000 mm1260×2040 mm800 mm600-800 t/h630-710 kW83.21 t4400×3866×4009 mm

The impact crusher (impact crusher) is a new generation of impact crusher developed in combination with the specific working conditions of the sand and gravel. Read the table column by column against manufactured-sand production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a remote mine site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivetight grading compliance
Evaluation horizonsingle-project view
Site conditiona remote mine site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for pf impact crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
  2. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  3. Book container or flat-rack space to Port Klang and prepare the customs document set in advance.
  4. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  8. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  9. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.

On manufactured-sand production, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Decommissioning or relocation value at the end of a single-project horizon.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Guaranteed power draw and the tight grading compliance trade-off it implies.
  • Control system language, telemetry and remote diagnostics availability.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Written performance guarantee, sampling method and acceptance-test protocol.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the single-project review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Overlooking dust, noise and water permits in Malaysia until erection has already started.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Using one liner profile for both secondary and tertiary stages.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.

On a remote mine site, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Sample each product fraction and compare with the specification.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Verify rotation direction on every motor before coupling.
  6. Check belt tracking, chute build-up and transfer-point dust.
  7. Record the baseline grading curve for each product fraction.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

For a full-time plant team, run through this list twice — once with the supervisor and once without.

PF Impact Crusher in Malaysia: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PF Impact Crusher be built for 415V 50Hz?

Yes — motors, starters and control panels are specified for 415V 50Hz before manufacture.

Where does HAMAC ship in Malaysia?

Standard delivery is quoted to Port Klang; an alternative port can be agreed in the contract.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

How is pf impact crusher shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call