Soft Rock Project References

Soft Rock: Reference Projects & Configurations. HAMAC equipment, configuration and cost for Soft Rock. With a commissioning checklist and common-pitfall notes.

Overview

Selected HAMAC references relevant to soft rock:

Overview — HAMAC crushing and grinding equipment reference
Overview — HAMAC crushing and grinding equipment reference.

References

  • 100-120tph mobile crushing and screening plant in Algeria
  • 100-120tph mobile crushing and screening plant in Chile
  • 1500t/d Gold Ore Processing Plant in Tanzania
  • 150-180tph stationary crushing and screening plant in Jamaica
  • 150tph stationary crushing and screening plant in Iraq

Reference data for this configuration

Key parameters at a glance
ParameterReference value
ApplicationSoft Rock
Typical feedLimestone, Marble, Dolomite
Assumed dutymanufactured-sand production
Evaluation horizonthree-year view

Use the table as a checklist when comparing quotations for the crushing and screening plant — a lower price often means one of these parameters was quietly reduced.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivestrict product cubicity
Evaluation horizonthree-year view
Site conditiona coastal export terminal
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  2. Sequence delivery so foundations cure while the equipment is still in manufacture.
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
  8. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  9. Choose compression or impact reduction according to hardness, silica content and required particle shape.

A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

What to verify before you sign

  • Product sampling points and the lab equipment needed for routine grading checks.
  • Decommissioning or relocation value at the end of a three-year horizon.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Guaranteed power draw and the strict product cubicity trade-off it implies.
  • Control system language, telemetry and remote diagnostics availability.
  • Liner alloy: Mn18 matched to the rock, not to the lowest purchase price.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Local service partner, technician travel time and visa requirements for your market.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

What to verify before you sign — HAMAC crushing and grinding equipment reference
What to verify before you sign — HAMAC crushing and grinding equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Buying strict product cubicity on price alone and losing it in availability.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.

For manufactured-sand production, protect the strict product cubicity requirement explicitly in the contract documents.

Commissioning checklist

  1. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  4. Sample each product fraction and compare with the specification.
  5. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  6. Confirm all guards, emergency stops and pull-wire switches function.
  7. Dry-run the plant empty for the specified period and record vibration.
  8. Record the baseline grading curve for each product fraction.

The commissioning record becomes the reference for every liner change in the three-year plan.

Soft Rock: Reference Projects & Configurations — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC build a similar plant?

Yes — share your material and capacity for a comparable proposal.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.