Crushing Plant Supplier in Saudi Arabia

Crushing Plant Supplier in Saudi Arabia. HAMAC crushes, screens and grinds equipment shipped to Jeddah at 380V 60Hz. Free quotation.

Overview

HAMAC supplies crushing and grinding equipment to Saudi Arabia, shipped to Jeddah and quoted to local standards (SASO). Power is configured for 380V 60Hz.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Crushing equipment for Saudi Arabia

  • Popular material: Limestone, Gabbro.
  • Destination port: Jeddah.
  • Voltage / frequency: 380V 60Hz.
  • Standards: SASO.

What HAMAC provides

  • Plant design for limestone and your capacity.
  • Equipment configured to 380V 60Hz and SASO.
  • FOB / CFR / CIF quotation to Jeddah.
  • Installation supervision, training and spare parts.

Logistics & documentation

HAMAC handles packing, container loading plan and the documentation required for Saudi Arabia, including certificates applicable to your market.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portJeddah
Site supply380V 60Hz
Local standardsSASO
RegionMiddle East
Assumed dutydemolition and recycling duties
Evaluation horizonfive-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivelowest energy per tonne
Evaluation horizonfive-year view
Site conditionan existing quarry bench
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  2. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  3. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Sequence delivery so foundations cure while the equipment is still in manufacture.
  6. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  7. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  8. Specify motors, starters and documentation for 380V 60Hz and SASO before manufacture.
  9. Choose compression or impact reduction according to hardness, silica content and required particle shape.

A HAMAC project manager stays with the order from the first data sheet through hand-over in Saudi Arabia.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Wear-part interchangeability across machines in the same circuit.
  • Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
  • Control system language, telemetry and remote diagnostics availability.
  • Whether the quoted t/h is achieved at demolition and recycling duties or under ideal laboratory feed.
  • Availability of a mixed local and expatriate team for liner changes and the lifting equipment on site.
  • Local service partner, technician travel time and visa requirements for Saudi Arabia.
  • Guaranteed power draw and the lowest energy per tonne trade-off it implies.
  • After-sales response time, technician availability and the warranty exclusions in writing.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

On demolition and recycling duties, the lowest energy per tonne objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.

For demolition and recycling duties, protect the lowest energy per tonne requirement explicitly in the contract documents.

Commissioning checklist

  1. Calibrate the belt scale and any level probes against a known load.
  2. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  3. Test emergency stops, pull wires and interlock trips in sequence.
  4. Confirm the direction and tension of every belt under no load.
  5. Verify rotation direction on every motor before coupling.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Record power draw, tonnage and chamber pressure at steady state.
  8. Hand over the spare-parts list, manuals and maintenance schedule.

The commissioning record becomes the reference for every liner change in the five-year plan.

Crushing Plant Supplier in Saudi Arabia — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC ship a crusher to Saudi Arabia?

Yes — equipment is delivered to Jeddah with documentation for the Saudi Arabia market.

What voltage is used in Saudi Arabia?

380V 60Hz; HAMAC sets motors and starters to your local supply.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What documents are needed for Saudi Arabia?

Packing list, commercial invoice, bill of lading, certificate of origin and the SASO documentation applicable to the machine.

How is the crushing and screening plant sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call