Construction & Demolition Recycling Equipment in Chile

Construction & Demolition Recycling crushing and screening plants in Chile: Mobile impact plus screening recovers rebar-free aggregate on site. Delivery to Valparaíso, 380V 50Hz, NCh.

Overview

Mobile impact plus screening recovers rebar-free aggregate on site. In Chile the most frequently processed feed materials are Copper ore, Basalt, and equipment is normally delivered through Valparaíso on 380V 50Hz supplies.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Materials in scope

  • Construction waste — Mohs 3, ~60 MPa, low abrasion
  • Concrete & asphalt — Mohs 3, ~50 MPa, low abrasion

Recommended machines

  • Mobile Jaw Crusher Plant
  • Mobile Impact Crusher Plant

Engineering for Chile

Chile project parameters
ItemReference
PortValparaíso
Power380V 50Hz
StandardsNCh
RegionSouth America

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portValparaíso
Site supply380V 50Hz
Local standardsNCh
RegionSouth America
ApplicationConstruction & Demolition Recycling
Typical feedConstruction waste, Concrete & asphalt
Assumed dutycontinuous quarry production
Evaluation horizonsingle-project view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and single-project operating plan.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivemaximum mechanical availability
Evaluation horizonsingle-project view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  2. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  3. Book container or flat-rack space to Valparaíso and prepare the customs document set in advance.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Review the crusher chamber profile with the liner supplier against the feed material.
  6. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  7. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  8. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  9. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.

A HAMAC project manager stays with the order from the first data sheet through hand-over in Chile.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

A single-project view normally reverses the ranking of two otherwise similar offers once wear and energy are included.

Mistakes that cost more than the machine

  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying maximum mechanical availability on price alone and losing it in availability.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Overlooking dust, noise and water permits in Chile until erection has already started.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

For continuous quarry production, protect the maximum mechanical availability requirement explicitly in the contract documents.

Commissioning checklist

  1. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  2. Check belt tracking, chute build-up and transfer-point dust.
  3. Check lubrication levels, grease lines and oil cooler operation.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Record the baseline grading curve for each product fraction.

On a greenfield site, allow extra time for the dust and noise measurements.

Construction & Demolition Recycling Crushing Plants in Chile — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Does HAMAC build construction & demolition recycling plants for Chile?

Yes — flow sheets are configured to the local feed, 380V 50Hz power and NCh requirements.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

How is the crushing and screening plant sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call