Overview
Mobile impact plus screening recovers rebar-free aggregate on site. In Chile the most frequently processed feed materials are Copper ore, Basalt, and equipment is normally delivered through Valparaíso on 380V 50Hz supplies.

Materials in scope
- Construction waste — Mohs 3, ~60 MPa, low abrasion
- Concrete & asphalt — Mohs 3, ~50 MPa, low abrasion
Recommended machines
- Mobile Jaw Crusher Plant
- Mobile Impact Crusher Plant
Engineering for Chile
| Item | Reference |
|---|---|
| Port | Valparaíso |
| Power | 380V 50Hz |
| Standards | NCh |
| Region | South America |
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Valparaíso |
| Site supply | 380V 50Hz |
| Local standards | NCh |
| Region | South America |
| Application | Construction & Demolition Recycling |
| Typical feed | Construction waste, Concrete & asphalt |
| Assumed duty | continuous quarry production |
| Evaluation horizon | single-project view |
Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and single-project operating plan.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | continuous quarry production |
| Primary objective | maximum mechanical availability |
| Evaluation horizon | single-project view |
| Site condition | a greenfield site |
| Operating team | a mixed local and expatriate team |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
- Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Book container or flat-rack space to Valparaíso and prepare the customs document set in advance.
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Review the crusher chamber profile with the liner supplier against the feed material.
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
A HAMAC project manager stays with the order from the first data sheet through hand-over in Chile.

What to verify before you sign
- Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
- Energy draw in kW and the expected kWh per tonne at the design duty.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
- After-sales response time, technician availability and the warranty exclusions in writing.
- Product sampling points and the lab equipment needed for routine grading checks.
- Erection scope: supervision only, or full civil, mechanical and electrical installation.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
A single-project view normally reverses the ranking of two otherwise similar offers once wear and energy are included.
Mistakes that cost more than the machine
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Using one liner profile for both secondary and tertiary stages.
- Buying maximum mechanical availability on price alone and losing it in availability.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Overlooking dust, noise and water permits in Chile until erection has already started.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
For continuous quarry production, protect the maximum mechanical availability requirement explicitly in the contract documents.
Commissioning checklist
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Check belt tracking, chute build-up and transfer-point dust.
- Check lubrication levels, grease lines and oil cooler operation.
- Measure and log the as-new CSS / setting for future wear comparison.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Confirm all guards, emergency stops and pull-wire switches function.
- Record the baseline grading curve for each product fraction.
On a greenfield site, allow extra time for the dust and noise measurements.