Technical long-tail guide

100–200 TPH Crushing Plant in Myanmar

100–200 TPH crushing plant supplied to Myanmar via Yangon at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 100–200 tph crushing plant is a common size for Myanmar. Main machines: PE/PEW jaw + cone + 3-deck screen. Most common export plant size.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE/PEW jaw + cone + 3-deck screen
  • Shipped to Yangon.
  • Configured to 380V 50Hz / MSS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Myanmar

  • Port: Yangon.
  • Voltage: 380V 50Hz.
  • Standards: MSS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Destination portYangon
Site supply380V 50Hz
Local standardsMSS
RegionAsia
Assumed dutymanufactured-sand production
Evaluation horizonfive-year view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and five-year operating plan.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivemaximum mechanical availability
Evaluation horizonfive-year view
Site conditiona coastal export terminal
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Review the crusher chamber profile with the liner supplier against the feed material.
  2. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  5. Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
  6. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  7. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  8. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  9. Choose compression or impact reduction according to hardness, silica content and required particle shape.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Dust and noise control designed to the local emission limits for Myanmar.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 100–200 t/h.
  • Wear-part interchangeability across machines in the same circuit.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Nameplate data for 380V 50Hz and the MSS certificate set.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Freight to Myanmar is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a coastal export terminal.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.

Review the list with a small contractor crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Confirm the direction and tension of every belt under no load.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Check belt tracking, chute build-up and transfer-point dust.
  4. Hand over the spare-parts list, manuals and maintenance schedule.
  5. Measure and log the as-new CSS / setting for future wear comparison.
  6. Test emergency stops, pull wires and interlock trips in sequence.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

100–200 TPH Crushing Plant in Myanmar — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 100–200 TPH plant to Myanmar?

Yes — to Yangon with MSS documentation.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.