200–300 TPH Crushing Plant in Kazakhstan

200–300 TPH crushing plant supplied to Kazakhstan via Aktau at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 200–300 tph crushing plant is a common size for Kazakhstan. Main machines: large jaw + 2× cone + screens. Mid-size quarry, multiple products.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • large jaw + 2× cone + screens
  • Shipped to Aktau.
  • Configured to 380V 50Hz / GOST.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Kazakhstan

  • Port: Aktau.
  • Voltage: 380V 50Hz.
  • Standards: GOST.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity200–300 t/h
Typical main linelarge jaw + 2× cone + screens
Scale noteMid-size quarry, multiple products.
Destination portAktau
Site supply380V 50Hz
Local standardsGOST
RegionAsia
Assumed dutymanufactured-sand production
Evaluation horizonthree-year view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and three-year operating plan.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivelowest energy per tonne
Evaluation horizonthree-year view
Site conditiona greenfield site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  2. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  3. Lay out the large jaw + 2× cone + screens arrangement with straight conveyor runs and crane access for liner changes.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  7. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  8. Review the crusher chamber profile with the liner supplier against the feed material.
  9. Specify motors, starters and documentation for 380V 50Hz and GOST before manufacture.

On manufactured-sand production, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Local service partner, technician travel time and visa requirements for Kazakhstan.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Dust and noise control designed to the local emission limits for Kazakhstan.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Liner alloy: Mn18 matched to the rock, not to the lowest purchase price.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to Kazakhstan is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Buying lowest energy per tonne on price alone and losing it in availability.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.

For manufactured-sand production, protect the lowest energy per tonne requirement explicitly in the contract documents.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  4. Calibrate the belt scale and any level probes against a known load.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Confirm all guards, emergency stops and pull-wire switches function.
  7. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  8. Dry-run the plant empty for the specified period and record vibration.

For a rotating shift crew, run through this list twice — once with the supervisor and once without.

200–300 TPH Crushing Plant in Kazakhstan — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 200–300 TPH plant to Kazakhstan?

Yes — to Aktau with GOST documentation.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.