50–100 TPH Crushing Plant in Qatar

50–100 TPH crushing plant supplied to Qatar via Hamad at 415V 50Hz. HAMAC equipment list, layout and CIF quotation. Written for buyers comparing equipment scope, not just price.

Overview

A 50–100 tph crushing plant is a common size for Qatar. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE jaw + PF impact / cone + 2-deck screen
  • Shipped to Hamad.
  • Configured to 415V 50Hz / QCS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Qatar

  • Port: Hamad.
  • Voltage: 415V 50Hz.
  • Standards: QCS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Destination portHamad
Site supply415V 50Hz
Local standardsQCS
RegionMiddle East
Assumed dutymine pre-beneficiation feed
Evaluation horizonsingle-project view

Treat this as a living sheet. Every revision of the flow sheet for Qatar should update the same fields so the equipment list stays traceable.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivesimple operator maintenance
Evaluation horizonsingle-project view
Site conditiona remote mine site
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  2. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  3. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  4. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  5. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  6. Book container or flat-rack space to Hamad and prepare the customs document set in advance.
  7. Review the crusher chamber profile with the liner supplier against the feed material.
  8. Size the primary stage for 50–100 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
  9. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.

On mine pre-beneficiation feed, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Closed-side setting range and whether automatic setting regulation is included.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Control system language, telemetry and remote diagnostics availability.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Decommissioning or relocation value at the end of a single-project horizon.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Energy draw in kW and the expected kWh per tonne at the design duty.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 50–100 t/h.
  • Omitting a bypass chute, so a single screen fault stops the whole line.

Review the list with a small contractor crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Record the baseline grading curve for each product fraction.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Check belt tracking, chute build-up and transfer-point dust.
  4. Confirm the direction and tension of every belt under no load.
  5. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Sample each product fraction and compare with the specification.
  8. Measure noise and dust at the operator position against the local limit.

Keep the signed record; it is the only defensible baseline for later performance disputes.

50–100 TPH Crushing Plant in Qatar — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 50–100 TPH plant to Qatar?

Yes — to Hamad with QCS documentation.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.