Coal remote site: Off-specification grading — solution & design basis

The product sieve curve drifts outside its envelope between shifts — a 80 t/h design basis, configuration and acceptance checks.

Coal remote site with off-specification grading is normally resolved by checking the circuit against the saleable product specification first: measure and log CSS after every liner change. For a 80 t/h design point on coal, HAMAC would review sizer / impact → screen, then confirm the settings with a written acceptance test. Start from the product specification and work backwards to the feed.

80 t/hindicative design point
10–50 MPacompressive strength
60–180 t/hscenario capacity band
240 kWorder-of-magnitude installed power
Key takeaways
  1. Coal is very low in abrasiveness and variable in moisture sensitivity; Low bulk density flips the usual sizing logic: volume, dust and explosion protection dominate over crusher power.
  2. For remote site the priority is energy and spares autonomy, constrained by diesel generation and infrequent service visits.
  3. Off-specification grading typically appears as: the product sieve curve drifts outside its envelope between shifts.
  4. First corrective action: measure and log CSS after every liner change.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for coal remote site

The design basis starts with the rock, not the machine. Coal is rated at 10–50 MPa compressive strength with very low abrasiveness, variable moisture sensitivity and a loose bulk density around 0.85 t/m³. Low bulk density flips the usual sizing logic: volume, dust and explosion protection dominate over crusher power. Record the setting before adjusting it, or the baseline is lost.

A remote site must run with limited grid power and a long spares lead time, constrained by diesel generation and infrequent service visits. The commercial priority is energy and spares autonomy. For this combination HAMAC works from an indicative design point of 80 t/h of saleable product, with a maximum feed top size near 400 mm and target fractions of −50 mm and washed size fractions.

Coal — design basis (nominal values)
ParameterIndicative value / method
Raw materialCoal · 10–50 MPa · abrasion very low
Design throughput80 t/h saleable product (60–180 t/h scenario band)
Maximum feed size~400 mm
Target product−50 mm and washed size fractions
Loose bulk density0.85 t/m³
Suggested circuitsizer / impact → screen
Coal remote site — Design basis for coal remote site — HAMAC vibrating screen
Coal remote site — Design basis for coal remote site — HAMAC vibrating screen reference.

Why off-specification grading appears in this circuit

The product sieve curve drifts outside its envelope between shifts. In a coal remote site this is usually a system symptom rather than a single machine fault. Start from the product specification and work backwards to the feed.

  • CSS has moved as liners wear and was not re-measured
  • screen media is worn, blinded or stretched
  • feed gradation changes as the quarry face advances

Operator notes from the first month are often the best diagnostic data. Before changing a crusher setting, check these in order: 1) run a full sieve analysis on each product fraction; 2) compare current CSS with the commissioning log; 3) inspect every deck for torn or blinded panels. Confirm all figures in a written proposal before purchase.

Recommended equipment configuration

For coal at 80 t/h the working train is sizer / impact → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for coal and for a softer rock. Record the setting before adjusting it, or the baseline is lost.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~100 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~42 mm at the secondary stage
Secondary / tertiaryscreen
ScreeningMulti-deck screen sized for 40% circulating load
ConveyingBelts sized for fresh feed + return stream, 0.85 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 240 kW order-of-magnitude connected load

The corrective actions for off-specification grading are applied on top of this base circuit: measure and log css after every liner change; set a screen-panel replacement interval based on aperture wear; adjust the closed-circuit return rate before changing the crusher setting.

Coal remote site — Recommended equipment configuration — HAMAC vibrating screen
Coal remote site — Recommended equipment configuration — HAMAC vibrating screen reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 42 mm, a circulating load around 40% and a screen efficiency target above 90%. Operator notes from the first month are often the best diagnostic data.

  • Run a full sieve analysis on each product fraction
  • Compare current CSS with the commissioning log
  • Inspect every deck for torn or blinded panels
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 80 t/h nominal
GradingFull sieve analysis, agreed standard, −50 mm and washed size fractions
Crusher settingCSS measured and logged, ~42 mm starting point
PowerMain-drive current at steady feed, 240 kW connected load
WearLiner mass before and after, cost per saleable tonne

Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for coal, while energy and spares autonomy determines how much lost production actually costs. Start from the product specification and work backwards to the feed.

  • Ask every supplier for the same flow sheet and mass balance, including the 40% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 80 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Record the setting before adjusting it, or the baseline is lost. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Coal remote site — Cost, risk and what to confirm in writing — HAMAC vibrating screen
Coal remote site — Cost, risk and what to confirm in writing — HAMAC vibrating screen reference.
FAQ

Coal remote site — questions answered

Direct answers to the questions buyers ask most often.

What causes off-specification grading in a coal remote site?

The product sieve curve drifts outside its envelope between shifts. The usual causes are css has moved as liners wear and was not re-measured; screen media is worn, blinded or stretched; feed gradation changes as the quarry face advances. measure and log CSS after every liner change.

Which crusher train suits coal at 60–180 t/h?

A typical configuration is sizer / impact → screen. Low bulk density flips the usual sizing logic: volume, dust and explosion protection dominate over crusher power. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 80 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.

WhatsApp Get a quote Call