Bauxite underground mine: Variable feed gradation — solution & design basis

Crusher power draw swings sharply with each loader cycle — a 110 t/h design basis, configuration and acceptance checks.

Bauxite underground mine with variable feed gradation is normally resolved by checking the circuit against the saleable product specification first: blend feed from two stockpile faces. For a 110 t/h design point on bauxite, HAMAC would review impact crusher → washing screen, then confirm the settings with a written acceptance test. The cheapest fix is usually a settings change; the most expensive is a new machine.

110 t/hindicative design point
30–90 MPacompressive strength
100–250 t/hscenario capacity band
350 kWorder-of-magnitude installed power
Key takeaways
  1. Bauxite is low in abrasiveness and high in moisture sensitivity; Sticky, clay-rich feed blocks grizzlies and screens; wet processing and generous transfer chutes are usual.
  2. For underground mine the priority is compact footprint, constrained by restricted headroom, ventilation and haulage access.
  3. Variable feed gradation typically appears as: crusher power draw swings sharply with each loader cycle.
  4. First corrective action: blend feed from two stockpile faces.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for bauxite underground mine

The design basis starts with the rock, not the machine. Bauxite is rated at 30–90 MPa compressive strength with low abrasiveness, high moisture sensitivity and a loose bulk density around 1.35 t/m³. Sticky, clay-rich feed blocks grizzlies and screens; wet processing and generous transfer chutes are usual. Measurements are only comparable when the sieve standard is the same.

A underground mine must fit crushing equipment into a confined excavation, constrained by restricted headroom, ventilation and haulage access. The commercial priority is compact footprint. For this combination HAMAC works from an indicative design point of 110 t/h of saleable product, with a maximum feed top size near 450 mm and target fractions of sized ore and washed fines.

Bauxite — design basis (nominal values)
ParameterIndicative value / method
Raw materialBauxite · 30–90 MPa · abrasion low
Design throughput110 t/h saleable product (100–250 t/h scenario band)
Maximum feed size~450 mm
Target productsized ore and washed fines
Loose bulk density1.35 t/m³
Suggested circuitimpact crusher → washing screen
Bauxite underground mine — Design basis for bauxite underground mine — HAMAC vibrating feeder
Bauxite underground mine — Design basis for bauxite underground mine — HAMAC vibrating feeder reference.

Why variable feed gradation appears in this circuit

Crusher power draw swings sharply with each loader cycle. In a bauxite underground mine this is usually a system symptom rather than a single machine fault. The cheapest fix is usually a settings change; the most expensive is a new machine.

  • segregation in the stockpile and the dump hopper
  • no surge buffer between the loader and the primary feeder
  • hard and soft bands are exposed simultaneously at the face

A change in one stage changes the circulating load in all the others. Before changing a crusher setting, check these in order: 1) sample feed gradation at three points across the belt; 2) record power draw at one-minute intervals; 3) check hopper level alarms and feeder response. Ask for the mass balance and the test method behind any quoted number.

Recommended equipment configuration

For bauxite at 110 t/h the working train is impact crusher → washing screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for bauxite and for a softer rock. Measurements are only comparable when the sieve standard is the same.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~138 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~38 mm at the secondary stage
Secondary / tertiarywashing screen
ScreeningMulti-deck screen sized for 30% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.35 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 350 kW order-of-magnitude connected load

The corrective actions for variable feed gradation are applied on top of this base circuit: blend feed from two stockpile faces; add a hopper with level control and a vfd feeder; set the drive power margin for the hardest band, not the average.

Bauxite underground mine — Recommended equipment configuration — HAMAC vibrating feeder
Bauxite underground mine — Recommended equipment configuration — HAMAC vibrating feeder reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 38 mm, a circulating load around 30% and a screen efficiency target above 90%. A change in one stage changes the circulating load in all the others.

  • Sample feed gradation at three points across the belt
  • Record power draw at one-minute intervals
  • Check hopper level alarms and feeder response
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 110 t/h nominal
GradingFull sieve analysis, agreed standard, sized ore and washed fines
Crusher settingCSS measured and logged, ~38 mm starting point
PowerMain-drive current at steady feed, 350 kW connected load
WearLiner mass before and after, cost per saleable tonne

Ask for the mass balance and the test method behind any quoted number. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for bauxite, while compact footprint determines how much lost production actually costs. The cheapest fix is usually a settings change; the most expensive is a new machine.

  • Ask every supplier for the same flow sheet and mass balance, including the 30% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 110 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Measurements are only comparable when the sieve standard is the same. Ask for the mass balance and the test method behind any quoted number. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Bauxite underground mine — Cost, risk and what to confirm in writing — HAMAC vibrating feeder
Bauxite underground mine — Cost, risk and what to confirm in writing — HAMAC vibrating feeder reference.
FAQ

Bauxite underground mine — questions answered

Direct answers to the questions buyers ask most often.

What causes variable feed gradation in a bauxite underground mine?

Crusher power draw swings sharply with each loader cycle. The usual causes are segregation in the stockpile and the dump hopper; no surge buffer between the loader and the primary feeder; hard and soft bands are exposed simultaneously at the face. blend feed from two stockpile faces.

Which crusher train suits bauxite at 100–250 t/h?

A typical configuration is impact crusher → washing screen. Sticky, clay-rich feed blocks grizzlies and screens; wet processing and generous transfer chutes are usual. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 110 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.