Design basis for LUM Ultrafine Vertical Mill grinding coal
The design basis starts with the powder, not the mill. Coal is a very soft mineral at Mohs 1–2 with variable moisture sensitivity and specific gravity about 1.3. For a flue-gas desulfurization the saleable target is pulverised coal, 70–90% <200 mesh at D97 75–200 µm. Explosion protection and drying dominate; fineness sets combustion efficiency. Operator notes from the first month are often the best diagnostic data.
A LUM Ultrafine Vertical Mill is a sensible starting point for this duty: 3–18 t/h capacity, 400–2500 mesh (D97 3–20 µm) fineness range, premium ultrafine powder with low iron contamination. For this combination HAMAC works from an indicative design point of 10 t/h of saleable powder, with a maximum feed size near 35 mm and a target D97 of 75–200. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Coal · Mohs 1–2 · very soft · SG 1.3 |
| Design throughput | 10 t/h saleable powder (8–40 t/h scenario band) |
| Target fineness | D97 75–200 µm |
| Maximum feed size | ~35 mm |
| Mill type | LUM Ultrafine Vertical Mill |
| Suggested line | crusher → dryer → vertical / ball mill |

Why iron contamination and whiteness loss appears in this grinding circuit
Brightness falls and dark specks appear in the finished filler. In a LUM Ultrafine Vertical Mill circuit on coal this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. Two plants with the same nominal t/h can have very different operating costs.
- tramp iron passes the upstream magnet
- worn liners and grinding elements add metallic fines
- mild-steel ducting or a worn classifier rotor sheds scale
Record the setting before adjusting it, or the baseline is lost. Before changing a mill setting, check these in order: 1) measure brightness on every finished batch; 2) test the magnet with a sample piece weekly; 3) inspect liners and rotor blades at each planned stop. HAMAC states nominal values alongside the conditions they were measured under.
Recommended grinding configuration
For coal at 10 t/h the working line is crusher → dryer → vertical / ball mill. The LUM Ultrafine Vertical Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. Operator notes from the first month are often the best diagnostic data.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~12 t/h design margin |
| Milling | LUM Ultrafine Vertical Mill, 3–18 t/h, 400–2500 mesh (D97 3–20 µm) |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 75–200 |
| Collection | Pulse-jet bag filter, negative pressure, ~18 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 18 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~140 kW connected load |
The corrective actions for iron contamination and whiteness loss are applied on top of this base circuit: fit a magnetic separator and metal detector before the mill; select wear materials against the required brightness specification; inspect and line the conveying path for exposed steel.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 75–200, a circulating load around 35% and a collection efficiency above 99%. Record the setting before adjusting it, or the baseline is lost.
- Measure brightness on every finished batch
- Test the magnet with a sample piece weekly
- Inspect liners and rotor blades at each planned stop
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 75–200, agreed standard |
| Capacity | Weighed saleable powder per shift, 10 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~140 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
HAMAC states nominal values alongside the conditions they were measured under. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for coal, while reactivity / fineness determines how much lost production actually costs. Two plants with the same nominal t/h can have very different operating costs.
- Ask every supplier for the same flow sheet and mass balance, including the 35% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 10 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
Operator notes from the first month are often the best diagnostic data. HAMAC states nominal values alongside the conditions they were measured under. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.