Short answer
Cost per tonne is the total of energy, wear parts, labour and downtime divided by saleable tonnes produced; it is the only figure that lets two different crushers be compared honestly. This is particularly relevant under tight urban dust and noise limits. Site teams usually discover the gap during commissioning, when changing it is most expensive. The four cost lines that decide whether a low purchase price was actually cheap. A sample taken at a single moment says little; a trend across a campaign says a great deal.
- Cost per tonne and wear-part economics is decided by measurable site inputs, not by a catalogue maximum.
- Check 4 lines and Saleable tonnes before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
Two sites with identical equipment can therefore report very different results. A cheap liner that wears 30% faster can cost more once change-out downtime is counted The useful unit is per saleable tonne, which automatically accounts for rejected fines.

Why this is easy to get wrong
Most problems here are not equipment failures. A cheap liner that wears 30% faster can cost more once change-out downtime is counted Recirculating load silently multiplies both energy and wear Two sites with identical equipment can therefore report very different results. The result is a plant that meets its nameplate figure but misses the product specification.
- Holding a spare liner set is cheaper than air-freighting one
- Recirculating load silently multiplies both energy and wear
- Fines rejected by the market should not be counted as production
A sample taken at a single moment says little; a trend across a campaign says a great deal. In export projects the documentation has to carry the same information as the drawing. Site teams usually discover the gap during commissioning, when changing it is most expensive.
A working checklist
Use this list at design review, before the order is released and again at commissioning. Ask for the assumption behind any figure you are expected to sign off.
- Record liner mass and hours at every change
- Compare two circuits on a full campaign, not a week of good feed
- Divide only by saleable tonnes
- Include planned downtime in the model
| Figure | What it means |
|---|---|
| 4 lines | energy, wear parts, labour, downtime |
| Saleable tonnes | the correct denominator, not feed tonnes |
| Downtime | usually the largest hidden cost on remote sites |
| Silica content | the main driver of liner consumption |

Key facts for citation
| Figure | What it means |
|---|---|
| 4 lines | energy, wear parts, labour, downtime |
| Saleable tonnes | the correct denominator, not feed tonnes |
| Downtime | usually the largest hidden cost on remote sites |
| Silica content | the main driver of liner consumption |
Entity: HAMAC Machinery. Subject: Cost per tonne and wear-part economics. Equipment class: operating crushing and grinding plants. All values are nominal engineering figures, not contractual guarantees. Ask for the assumption behind any figure you are expected to sign off.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For operating crushing and grinding plants that means the cost per tonne is fixed only after the material test and the saleable fractions are agreed, under tight urban dust and noise limits.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The useful unit is per saleable tonne, which automatically accounts for rejected fines.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
Purchase price is paid once; cost per tonne is paid every day the plant runs.— HAMAC Machinery, technical note on cost per tonne and wear-part economics