Mobile VSI Crusher Plant (Tertiary Crushing) — Direct from the Manufacturer

HAMAC is a direct Mobile VSI Crusher Plant (Tertiary Crushing) manufacturer: 20+ years, 60,000 m² base, 180+ countries. Factory price, engineering, installation and spare parts.

Overview

Buying a Mobile VSI Crusher Plant (Tertiary Crushing) direct from HAMAC removes the trading margin and gives you engineering support from enquiry to commissioning.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

Why buy direct

  • One project manager for the whole order.
  • Workshop assembly, test and container loading plan.
  • Flow-sheet design, layout and foundation reference.
  • Installation supervision, training and 24h technical response.

Export & documentation

Quoted FOB / CFR / CIF. Documentation applicable to your market (CE where required), Spanish manuals for LatAm, motors set to local voltage.

How to order

Send project data → receive design + budget in 24h → refine drawings → manufacture → install.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineMobile VSI Crusher Plant (Tertiary Crushing)
CategoryWheel Type Mobile Crushers
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonfive-year view

Ask for the same table from any competing supplier; without it, an offer for mobile vsi crusher plant (tertiary crushing) cannot be compared on scope.

Published Mobile VSI Crusher Plant (Tertiary Crushing) model data

Mobile VSI Crusher Plant (Tertiary Crushing) — nominal published data
ModelVSI unitBelt feederVibrating screenCapacity (t/h)
K3-V7615-1CVS17615B10003YK184850–150
K3-V8522-1CVS18522B10003YK1548100–200
K3-V9532-1CVS19532B12003YK1848150–300
K3-V1145-1CVS11145B1200—200–400

K3 series wheel-mounted VSI plant for third-stage crushing, 50–400 t/h, for complete sand making or high-quality shaped aggregate. Read the table column by column against high-tonnage aggregate supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivesimple operator maintenance
Evaluation horizonfive-year view
Site conditiona greenfield site
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for mobile vsi crusher plant (tertiary crushing) may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  2. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  3. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  4. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  5. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  6. Plan training for an owner-operator team on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  8. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  9. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.

For an owner-operator team, the commissioning and training steps need more calendar time than the mechanical erection itself.

From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference
From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference.

What to verify before you sign

  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Availability of an owner-operator team for liner changes and the lifting equipment on site.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Using one liner profile for both secondary and tertiary stages.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Overlooking dust, noise and water permits in your market until erection has already started.

For high-tonnage aggregate supply, protect the simple operator maintenance requirement explicitly in the contract documents.

Commissioning checklist

  1. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  2. Check belt tracking, chute build-up and transfer-point dust.
  3. Record the baseline grading curve for each product fraction.
  4. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  5. Calibrate the belt scale and any level probes against a known load.
  6. Confirm the direction and tension of every belt under no load.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Check lubrication levels, grease lines and oil cooler operation.

The commissioning record becomes the reference for every liner change in the five-year plan.

Mobile VSI Crusher Plant (Tertiary Crushing) Manufacturer & Supplier — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Is HAMAC the original manufacturer?

Yes — HAMAC is a Zhengzhou-based manufacturer with 20+ years of experience.

Do you ship to my country?

HAMAC equipment has been delivered to 180+ countries and regions; share your destination port for a CIF quote.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

How is mobile vsi crusher plant (tertiary crushing) sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.