Spiral (Screw) Sand Washer Applications

Where a Spiral (Screw) Sand Washer is used: materials it handles, industries it serves and typical plant configurations across aggregates, mining and recycling.

Overview

The Spiral (Screw) Sand Washer is applied across aggregates, mining, beneficiation and recycling. The material properties decide whether it is the right machine.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

Materials it handles

  • Hard rock: granite, basalt, andesite, gabbro.
  • Soft rock: limestone, marble, dolomite.
  • Ores: iron, copper, gold, manganese.
  • Recycling: concrete, asphalt, C&D waste.

Industries

  • Quarrying and construction aggregates.
  • Metal ore crushing and beneficiation.
  • Manufactured sand and road base.
  • Cement raw meal and industrial minerals.

Typical configuration

Usually combined with a feeder, screen and conveyors into a complete circuit, or as a module in a mobile plant.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineSpiral (Screw) Sand Washer
CategorySand Making & Washing
Assumed dutydemolition and recycling duties
Evaluation horizonfive-year view

Use the table as a checklist when comparing quotations for spiral (screw) sand washer — a lower price often means one of these parameters was quietly reduced.

Published Spiral (Screw) Sand Washer model data

Spiral (Screw) Sand Washer — nominal published data
ModelScrew diameter (mm)Sink length (mm)Feeding size (mm)Capacity (t/h)Power (kW)
XL5155157615≤105–155.5
XL7657657620≤1020–6011
XL9209207585≤1040–11011
2XL9209207585≤1080–2202×11
XL112011209750≤1050–13018.5
2XL112011209750≤10100–2602×18.5

XL / 2XL screw sand washers, 5–260 t/h, remove clay and fines from manufactured sand with low water consumption. Read the table column by column against demolition and recycling duties: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a confined urban yard in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivestrict product cubicity
Evaluation horizonfive-year view
Site conditiona confined urban yard
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for spiral (screw) sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  4. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  5. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  6. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  7. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  8. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  9. Confirm the haul-road and stockpile plan with a confined urban yard in mind before fixing conveyor lengths.

A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference
From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference.

What to verify before you sign

  • Guaranteed power draw and the strict product cubicity trade-off it implies.
  • Local service partner, technician travel time and visa requirements for your market.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Decommissioning or relocation value at the end of a five-year horizon.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Buying strict product cubicity on price alone and losing it in availability.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.

Review the list with a small contractor crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure noise and dust at the operator position against the local limit.
  2. Confirm all guards, emergency stops and pull-wire switches function.
  3. Dry-run the plant empty for the specified period and record vibration.
  4. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  5. Test emergency stops, pull wires and interlock trips in sequence.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Record the baseline grading curve for each product fraction.
  8. Agree the punch list, sign the hand-over protocol and file the as-built drawings.

On a confined urban yard, allow extra time for the dust and noise measurements.

Spiral (Screw) Sand Washer Applications & Suitable Materials — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can a Spiral (Screw) Sand Washer produce manufactured sand?

For sand, a VSI is the shaping stage after the Spiral (Screw) Sand Washer; the two are often paired in a complete line.

Is it suitable for recycling?

With a magnet and proper feed control, yes — especially impact-based units for concrete and asphalt.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call