● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Crawler (Tracked) Vibrating Screen TS Series Applications

Where a Crawler (Tracked) Vibrating Screen TS Series is used: materials it handles, industries it serves and typical plant configurations across aggregates, mining and recycling.

Overview

The Crawler (Tracked) Vibrating Screen TS Series is applied across aggregates, mining, beneficiation and recycling. The material properties decide whether it is the right machine.

Overview — HAMAC vibrating screen reference
Overview — HAMAC vibrating screen reference.

Materials it handles

  • Hard rock: granite, basalt, andesite, gabbro.
  • Soft rock: limestone, marble, dolomite.
  • Ores: iron, copper, gold, manganese.
  • Recycling: concrete, asphalt, C&D waste.

Industries

  • Quarrying and construction aggregates.
  • Metal ore crushing and beneficiation.
  • Manufactured sand and road base.
  • Cement raw meal and industrial minerals.

Typical configuration

Usually combined with a feeder, screen and conveyors into a complete circuit, or as a module in a mobile plant.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineCrawler (Tracked) Vibrating Screen TS Series
CategoryTracked Crushing Plants
Assumed dutyseasonal road-project supply
Evaluation horizonseven-year view

Treat this as a living sheet. Every revision of the flow sheet for your market should update the same fields so the equipment list stays traceable.

Published Crawler (Tracked) Vibrating Screen TS Series model data

Crawler (Tracked) Vibrating Screen TS Series — nominal published data
ModelTS1860TS2160
Screen deck1800 × 6000 mm, 3 decks2100 × 6000 mm, 3 decks
Max. feeding size≤200 mm≤200 mm
Capacity65–586 t/h81–720 t/h
Motor power22 kW30 kW
Feeding conveyorB1000 × 11.8 mB1000 × 11.8 m
Generator360 kW500 kW

TS1860 / TS2160 tracked three-deck screens, 65–720 t/h, for standalone screening or closed-circuit mobile plants. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivestrict product cubicity
Evaluation horizonseven-year view
Site conditiona greenfield site
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for crawler (tracked) vibrating screen ts series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  2. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  3. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  4. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  5. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  6. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  7. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  8. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  9. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

From enquiry to the first saleable tonne — HAMAC vibrating screen reference
From enquiry to the first saleable tonne — HAMAC vibrating screen reference.

What to verify before you sign

  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Availability of an owner-operator team for liner changes and the lifting equipment on site.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Guaranteed power draw and the strict product cubicity trade-off it implies.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Dust and noise control designed to the local emission limits for your market.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Letting the seasonal road-project supply duty be defined verbally instead of in the contract.
  • Using one liner profile for both secondary and tertiary stages.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Dry-run the plant empty for the specified period and record vibration.
  2. Sample each product fraction and compare with the specification.
  3. Hand over the spare-parts list, manuals and maintenance schedule.
  4. Measure noise and dust at the operator position against the local limit.
  5. Verify rotation direction on every motor before coupling.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Check lubrication levels, grease lines and oil cooler operation.

For an owner-operator team, run through this list twice — once with the supervisor and once without.

Crawler (Tracked) Vibrating Screen TS Series Applications & Suitable Materials — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can a Crawler (Tracked) Vibrating Screen TS Series produce manufactured sand?

For sand, a VSI is the shaping stage after the Crawler (Tracked) Vibrating Screen TS Series; the two are often paired in a complete line.

Is it suitable for recycling?

With a magnet and proper feed control, yes — especially impact-based units for concrete and asphalt.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call