● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Open side setting (OSS)

What open side setting (oss) means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

The maximum chamber gap at the discharge point; OSS minus CSS equals the eccentric throw.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • Determines the largest particle that can pass
  • Used with CSS to calculate stroke
  • Relevant for jaw and gyratory machines

Applying it to plant selection

Engineers use open side setting (oss) together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutycement raw-meal preparation
Evaluation horizonthree-year view

Ask for the same table from any competing supplier; without it, an offer for the crushing and screening plant cannot be compared on scope.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycement raw-meal preparation
Primary objectivelowest energy per tonne
Evaluation horizonthree-year view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  2. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  3. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  4. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  7. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  8. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  9. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

What to verify before you sign

  • Decommissioning or relocation value at the end of a three-year horizon.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Whether the quoted t/h is achieved at cement raw-meal preparation or under ideal laboratory feed.
  • Liner alloy: high-chrome iron matched to the rock, not to the lowest purchase price.
  • Control system language, telemetry and remote diagnostics availability.
  • Local service partner, technician travel time and visa requirements for your market.
  • Product sampling points and the lab equipment needed for routine grading checks.

For cement raw-meal preparation, give the lowest energy per tonne line extra weight; a generic checklist will not rank the offers correctly.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Letting the cement raw-meal preparation duty be defined verbally instead of in the contract.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Buying lowest energy per tonne on price alone and losing it in availability.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  2. Sample each product fraction and compare with the specification.
  3. Confirm the direction and tension of every belt under no load.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Calibrate the belt scale and any level probes against a known load.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Check hydraulic pressure, accumulator pre-charge and tramp-release function.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Open side setting (OSS): Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines open side setting (oss) for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

How is the crushing and screening plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call