● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Magnetic separator

What magnetic separator means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

A magnet or drum that removes ferrous metal from the material stream.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • Standard on C&D recycling plants
  • Protects downstream crushers
  • Recovers saleable scrap steel

Applying it to plant selection

Engineers use magnetic separator together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutymine pre-beneficiation feed
Evaluation horizonsingle-project view

Use the table as a checklist when comparing quotations for the crushing and screening plant — a lower price often means one of these parameters was quietly reduced.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivelowest cost per tonne
Evaluation horizonsingle-project view
Site conditiona remote mine site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  2. Book shipping, prepare the packing list and confirm the container loading plan.
  3. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  4. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  5. Review the crusher chamber profile with the liner supplier against the feed material.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  9. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.

On mine pre-beneficiation feed, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

What to verify before you sign

  • Local service partner, technician travel time and visa requirements for your market.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Wear-part interchangeability across machines in the same circuit.
  • Liner alloy: Mn13 matched to the rock, not to the lowest purchase price.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Written performance guarantee, sampling method and acceptance-test protocol.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a remote mine site.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Overlooking dust, noise and water permits in your market until erection has already started.

On a remote mine site, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  4. Record power draw, tonnage and chamber pressure at steady state.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Record the baseline grading curve for each product fraction.
  7. Dry-run the plant empty for the specified period and record vibration.
  8. Check belt tracking, chute build-up and transfer-point dust.

The commissioning record becomes the reference for every liner change in the single-project plan.

Magnetic separator: Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines magnetic separator for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

How is the crushing and screening plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Do you build plants for mine pre-beneficiation feed?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call