● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Flakiness index

What flakiness index means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

The mass percentage of aggregate particles whose smallest dimension is less than a defined fraction of their mean size.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • Road base specs commonly cap it at 30–35%
  • Improved by a VSI shaping stage
  • Worse with worn jaw plates and wrong CSS

Applying it to plant selection

Engineers use flakiness index together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonfive-year view

At high-tonnage aggregate supply, the ranking of these parameters changes: maximum mechanical availability usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivemaximum mechanical availability
Evaluation horizonfive-year view
Site conditiona confined urban yard
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Book shipping, prepare the packing list and confirm the container loading plan.
  2. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  3. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  4. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  7. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  8. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  9. Check bearing and lubrication arrangements against the ambient temperature range at the site.

On high-tonnage aggregate supply, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

What to verify before you sign

  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Whether the quoted t/h is achieved at high-tonnage aggregate supply or under ideal laboratory feed.
  • Local service partner, technician travel time and visa requirements for your market.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Decommissioning or relocation value at the end of a five-year horizon.
  • Control system language, telemetry and remote diagnostics availability.
  • Energy draw in kW and the expected kWh per tonne at the design duty.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On high-tonnage aggregate supply, the maximum mechanical availability objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.

On a confined urban yard, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Calibrate the belt scale and any level probes against a known load.
  2. Confirm all guards, emergency stops and pull-wire switches function.
  3. Test emergency stops, pull wires and interlock trips in sequence.
  4. Record power draw, tonnage and chamber pressure at steady state.
  5. Hand over the spare-parts list, manuals and maintenance schedule.
  6. Check lubrication levels, grease lines and oil cooler operation.
  7. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  8. Verify rotation direction on every motor before coupling.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Flakiness index: Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines flakiness index for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

How is the crushing and screening plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call