Technical long-tail guide

Container loading plan and OOG cargo

What container loading plan and oog cargo means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

A packing plan that allocates machines and parts across flat-rack, open-top and standard containers.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • Large jaw frames often ship out of gauge
  • Centre of gravity must be documented
  • Lifting points and sea-fastening are specified

Applying it to plant selection

Engineers use container loading plan and oog cargo together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutymanufactured-sand production
Evaluation horizonten-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivesimple operator maintenance
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  2. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  3. Book shipping, prepare the packing list and confirm the container loading plan.
  4. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  7. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  8. Review the crusher chamber profile with the liner supplier against the feed material.
  9. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign

  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Local service partner, technician travel time and visa requirements for your market.
  • Liner alloy: Mn18 matched to the rock, not to the lowest purchase price.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Guaranteed power draw and the simple operator maintenance trade-off it implies.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • After-sales response time, technician availability and the warranty exclusions in writing.

For manufactured-sand production, give the simple operator maintenance line extra weight; a generic checklist will not rank the offers correctly.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.

For manufactured-sand production, protect the simple operator maintenance requirement explicitly in the contract documents.

Commissioning checklist

  1. Test emergency stops, pull wires and interlock trips in sequence.
  2. Verify rotation direction on every motor before coupling.
  3. Measure and log the as-new CSS / setting for future wear comparison.
  4. Confirm the direction and tension of every belt under no load.
  5. Check belt tracking, chute build-up and transfer-point dust.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Check lubrication levels, grease lines and oil cooler operation.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Container loading plan and OOG cargo: Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines container loading plan and oog cargo for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

How is the crushing and screening plant sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call