Overview
HAMAC supplies crushing and grinding equipment to Brazil, shipped to Santos and quoted to local standards (ABNT). Power is configured for 380V 60Hz.

Crushing equipment for Brazil
- Popular material: Granite, Iron ore.
- Destination port: Santos.
- Voltage / frequency: 380V 60Hz.
- Standards: ABNT.
What HAMAC provides
- Plant design for granite and your capacity.
- Equipment configured to 380V 60Hz and ABNT.
- FOB / CFR / CIF quotation to Santos.
- Installation supervision, training and spare parts.
Logistics & documentation
HAMAC handles packing, container loading plan and the documentation required for Brazil, including certificates applicable to your market.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Santos |
| Site supply | 380V 60Hz |
| Local standards | ABNT |
| Region | South America |
| Assumed duty | high-tonnage aggregate supply |
| Evaluation horizon | five-year view |
HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | high-tonnage aggregate supply |
| Primary objective | fast mobilisation |
| Evaluation horizon | five-year view |
| Site condition | a coastal export terminal |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
- Specify motors, starters and documentation for 380V 60Hz and ABNT before manufacture.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
For a small contractor crew, the commissioning and training steps need more calendar time than the mechanical erection itself.

What to verify before you sign
- Erection scope: supervision only, or full civil, mechanical and electrical installation.
- Nameplate data for 380V 60Hz and the ABNT certificate set.
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
- Closed-side setting range and whether automatic setting regulation is included.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Guaranteed power draw and the fast mobilisation trade-off it implies.
- Wear-part interchangeability across machines in the same circuit.
The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.
Mistakes that cost more than the machine
- Buying fast mobilisation on price alone and losing it in availability.
- Assuming the manufacturer's warranty covers wear parts and consumables.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Letting the high-tonnage aggregate supply duty be defined verbally instead of in the contract.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
On a coastal export terminal, the civil and logistics items deserve as much attention as the crusher itself.
Commissioning checklist
- Check belt tracking, chute build-up and transfer-point dust.
- Check lubrication levels, grease lines and oil cooler operation.
- Test emergency stops, pull wires and interlock trips in sequence.
- Sample each product fraction and compare with the specification.
- Record the baseline grading curve for each product fraction.
- Confirm the direction and tension of every belt under no load.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Measure noise and dust at the operator position against the local limit.
On a coastal export terminal, allow extra time for the dust and noise measurements.
