Overview
Mobile impact plants recover rebar-free aggregate from demolition concrete and RAP asphalt directly on site in Mozambique, cutting haulage and landfill cost.

Scope of supply
- Tracked or wheel impact crusher with a magnet.
- Grizzly / scalping screen to remove fines and soil.
- Air separation for light contaminants.
- Closed-loop water where washing is required.
- Product certification to local MOQ grading.
Market parameters for Mozambique
| Item | Reference |
|---|---|
| Region | Africa |
| Port | Maputo |
| Voltage / frequency | 380V 50Hz |
| Standards | MOQ |
| Typical feed | Limestone, Coal |
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Concrete & asphalt |
| Mohs hardness | 3 |
| Compressive strength | ~50 MPa |
| Abrasiveness | Low |
| Recommended circuit | mobile impact + screen |
| Destination port | Maputo |
| Site supply | 380V 50Hz |
| Local standards | MOQ |
| Region | Africa |
| Assumed duty | cement raw-meal preparation |
| Evaluation horizon | ten-year view |
At cement raw-meal preparation, the ranking of these parameters changes: maximum mechanical availability usually becomes the deciding constraint rather than the headline tonnage.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | cement raw-meal preparation |
| Primary objective | maximum mechanical availability |
| Evaluation horizon | ten-year view |
| Site condition | a confined urban yard |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for concrete & asphalt crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Apply mobile impact + screen; the reduction mechanism must suit low abrasion and a compressive strength near 50 MPa.
- Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
- Review the crusher chamber profile with the liner supplier against Concrete & asphalt (Mohs 3, ~50 MPa, low abrasion).
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Survey the feed: Concrete & asphalt (Mohs 3, ~50 MPa, low abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
- Book container or flat-rack space to Maputo and prepare the customs document set in advance.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.
What to verify before you sign
- Wear-part interchangeability across machines in the same circuit.
- Dust and noise control designed to the local emission limits for Mozambique.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Whether the quoted t/h is achieved at cement raw-meal preparation or under ideal laboratory feed.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Nameplate data for 380V 50Hz and the MOQ certificate set.
- Local service partner, technician travel time and visa requirements for Mozambique.
- Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 13% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.
Mistakes that cost more than the machine
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
- Specifying motors for the wrong voltage or frequency and rewinding them on site.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Overlooking dust, noise and water permits in Mozambique until erection has already started.
- Comparing quotations with different port terms and calling the lower number cheaper.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Using one liner profile for both secondary and tertiary stages.
Review the list with a small contractor crew before the order is placed — they will recognise most of them.
Commissioning checklist
- Confirm the direction and tension of every belt under no load.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Check belt tracking, chute build-up and transfer-point dust.
- Dry-run the plant empty for the specified period and record vibration.
- Sample each product fraction and compare with the specification.
- Test emergency stops, pull wires and interlock trips in sequence.
- Check lubrication levels, grease lines and oil cooler operation.
- Record the baseline grading curve for each product fraction.
Keep the signed record; it is the only defensible baseline for later performance disputes.