Technical long-tail guide

50–100 TPH Crushing Plant in India

50–100 TPH crushing plant supplied to India via Mumbai at 415V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 50–100 tph crushing plant is a common size for India. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE jaw + PF impact / cone + 2-deck screen
  • Shipped to Mumbai.
  • Configured to 415V 50Hz / BIS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For India

  • Port: Mumbai.
  • Voltage: 415V 50Hz.
  • Standards: BIS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Destination portMumbai
Site supply415V 50Hz
Local standardsBIS
RegionAsia
Assumed dutymanufactured-sand production
Evaluation horizonten-year view

At manufactured-sand production, the ranking of these parameters changes: lowest cost per tonne usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivelowest cost per tonne
Evaluation horizonten-year view
Site conditiona greenfield site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Review the crusher chamber profile with the liner supplier against the feed material.
  2. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  3. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  4. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  5. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  6. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  7. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  8. Size the primary stage for 50–100 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
  9. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Energy draw in kW and the expected kWh per tonne at the design duty.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Using one liner profile for both secondary and tertiary stages.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Measure noise and dust at the operator position against the local limit.
  4. Hand over the spare-parts list, manuals and maintenance schedule.
  5. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  6. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Calibrate the belt scale and any level probes against a known load.

For a rotating shift crew, run through this list twice — once with the supervisor and once without.

50–100 TPH Crushing Plant in India — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 50–100 TPH plant to India?

Yes — to Mumbai with BIS documentation.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.