Technical long-tail guide

Above 800 TPH Copper ore Crushing Plant

Above 800 TPH Copper ore crushing plant: jaw + cone, capacity 800–1500 t/h. HAMAC configuration, equipment list and budget.

Overview

A above 800 tph plant for copper ore (Mohs 4, ~120 MPa, medium abrasion). Recommended circuit: jaw + cone.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Copper ore at this scale

Above 800 TPH Copper ore
Capacity800–1500 t/h
MaterialCopper ore (Medium abrasion)
Circuitjaw + cone

Equipment

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher

Notes

Crushed then ground for flotation / SX-EW.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialCopper ore
Mohs hardness4
Compressive strength~120 MPa
AbrasivenessMedium
Recommended circuitjaw + cone
Design capacity800–1500 t/h
Typical main linegyratory primary + SAG feed
Scale noteMine-scale, often with HPGR.
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonten-year view

Treat this as a living sheet. Every revision of the flow sheet for your market should update the same fields so the equipment list stays traceable.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivesimple operator maintenance
Evaluation horizonten-year view
Site conditiona greenfield site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for copper ore crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  4. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  5. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  6. Sequence delivery so foundations cure while the equipment is still in manufacture.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  9. Check bearing and lubrication arrangements against the ambient temperature range at the site.

A realistic programme reserves time for permits, foundation curing and shipping to your market before any steel is cut.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Closed-side setting range and whether automatic setting regulation is included.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Wear-part interchangeability across machines in the same circuit.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Written performance guarantee, sampling method and acceptance-test protocol.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages56%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables6%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Using one liner profile for both secondary and tertiary stages.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.

Review the list with a full-time plant team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Check belt tracking, chute build-up and transfer-point dust.
  2. Confirm all guards, emergency stops and pull-wire switches function.
  3. Sample each product fraction and compare with the specification.
  4. Check lubrication levels, grease lines and oil cooler operation.
  5. Test emergency stops, pull wires and interlock trips in sequence.
  6. Calibrate the belt scale and any level probes against a known load.
  7. Confirm the direction and tension of every belt under no load.
  8. Record the baseline grading curve for each product fraction.

On a greenfield site, allow extra time for the dust and noise measurements.

Above 800 TPH Copper ore Crushing Plant — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Copper ore at Above 800 TPH?

jaw + cone. Crushed then ground for flotation / SX-EW.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Which wear-part grade should I order?

For copper ore (medium abrasion), Mn13 is a common starting point; HAMAC confirms it in the technical proposal.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Do you build plants for high-tonnage aggregate supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.