Overview
A 200–300 tph plant for construction waste (Mohs 3, ~60 MPa, low abrasion). Recommended circuit: mobile jaw + impact + screen.

Construction waste at this scale
| Capacity | 200–300 t/h |
|---|---|
| Material | Construction waste (Low abrasion) |
| Circuit | mobile jaw + impact + screen |
Equipment
- Mobile Jaw Crusher Plant
- Mobile Impact Crusher Plant
Notes
Recycling concrete & asphalt; magnet + air sorter.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Construction waste |
| Mohs hardness | 3 |
| Compressive strength | ~60 MPa |
| Abrasiveness | Low |
| Recommended circuit | mobile jaw + impact + screen |
| Design capacity | 200–300 t/h |
| Typical main line | large jaw + 2× cone + screens |
| Scale note | Mid-size quarry, multiple products. |
| Assumed duty | contract crushing on short-term sites |
| Evaluation horizon | seven-year view |
The figures above are transcribed from published HAMAC data and from the material properties of construction waste; site measurements take precedence.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | contract crushing on short-term sites |
| Primary objective | strict product cubicity |
| Evaluation horizon | seven-year view |
| Site condition | a remote mine site |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for construction waste crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Survey the feed: Construction waste (Mohs 3, ~60 MPa, low abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
- Book shipping, prepare the packing list and confirm the container loading plan.
- Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
A realistic programme reserves time for permits, foundation curing and shipping to your market before any steel is cut.

What to verify before you sign
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for 200–300 t/h.
- Decommissioning or relocation value at the end of a seven-year horizon.
- Wear-part interchangeability across machines in the same circuit.
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
- Product sampling points and the lab equipment needed for routine grading checks.
- Local service partner, technician travel time and visa requirements for your market.
- Choke-feed arrangement: surge bin, feeder control and level indication.
- Liner alloy: high-chrome iron is a common starting point for construction waste at low abrasion.
These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 9% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 9% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 8% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
A seven-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.
Mistakes that cost more than the machine
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Letting the contract crushing on short-term sites duty be defined verbally instead of in the contract.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Overlooking dust, noise and water permits in your market until erection has already started.
- Undersizing the screen, then blaming the crusher for a plant that never reaches 200–300 t/h.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
On a remote mine site, the civil and logistics items deserve as much attention as the crusher itself.
Commissioning checklist
- Hand over the spare-parts list, manuals and maintenance schedule.
- Confirm the direction and tension of every belt under no load.
- Confirm all guards, emergency stops and pull-wire switches function.
- Test emergency stops, pull wires and interlock trips in sequence.
- Check lubrication levels, grease lines and oil cooler operation.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Measure noise and dust at the operator position against the local limit.
- Record the baseline grading curve for each product fraction.
The commissioning record becomes the reference for every liner change in the seven-year plan.