● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PE Series Jaw Crusher for Russia

PE Series Jaw Crusher supplied to Russia: published model data, 380V 50Hz motors, GOST documentation and delivery to St Petersburg. HAMAC factory quotation.

Overview

This page brings together the published PE Series Jaw Crusher model data and the practical details of importing it into Russia — power supply, standards, shipping and commissioning. Popular feed materials in the market include Granite, Coal, Basalt.

Overview — HAMAC jaw crusher reference
Overview — HAMAC jaw crusher reference.

Published PE Series Jaw Crusher data

PE Series Jaw Crusher nominal technical data
Published parameterNominal value
PEX250x750250x750 mm 210 mm
PEX250x1000250x1000 mm 210 mm
PEX250x1200250x1200 mm 210 mm
PEX300x1300300x1300 mm 250 mm
PE400×600400×600 mm 340 mm
PE500×750500×750 mm 425 mm

Local conditions in Russia

  • Destination port: St Petersburg.
  • Site supply: 380V 50Hz.
  • Standards: GOST.
  • Common materials: Granite, Coal, Basalt.
  • Region: Europe/Asia.

Delivery scope

HAMAC quotes FOB, CFR or CIF to St Petersburg, sets motors and starters to 380V 50Hz, and supplies the certificate set applicable to GOST. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portSt Petersburg
Site supply380V 50Hz
Local standardsGOST
RegionEurope/Asia
Machine linePE Series Jaw Crusher
CategoryJaw Crusher
Assumed dutyseasonal road-project supply
Evaluation horizonseven-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Published PE Series Jaw Crusher model data

PE Series Jaw Crusher — nominal published data
ModelInput SizeMax Feeding SizeOutput RangeCapacityEngine PowerWeight
PEX250x750250x750 mm210 mm25-60 mm13-35 T/H30 KW5.5 T
PEX250x1000250x1000 mm210 mm25-60 mm16-52 T/H37 KW7 T
PEX250x1200250x1200 mm210 mm25-60 mm20-61 T/H55 KW9.5 T
PEX300x1300300x1300 mm250 mm20-90 mm16-105 T/H75 KW15.6 T
PE400×600400×600 mm340 mm40-100 mm16-60 T/H30 KW6.7 T
PE500×750500×750 mm425 mm50-100 mm40-110 T/H55 KW11.7 T
PE600×900600×900 mm500 mm65-180 mm80-180 T/H55-75 KW16.1 T
PE750×1060750×1060 mm630 mm80-180 mm110-320 T/H90-110 KW30.1 T

Jaw crushers are often used for primary crushing in mine material crushing. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivetight grading compliance
Evaluation horizonseven-year view
Site conditiona greenfield site
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for pe series jaw crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  2. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  3. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Book container or flat-rack space to St Petersburg and prepare the customs document set in advance.
  8. Review the crusher chamber profile with the liner supplier against the feed material.
  9. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC jaw crusher reference
From enquiry to the first saleable tonne — HAMAC jaw crusher reference.

What to verify before you sign

  • Decommissioning or relocation value at the end of a seven-year horizon.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Dust and noise control designed to the local emission limits for Russia.
  • Guaranteed power draw and the tight grading compliance trade-off it implies.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Availability of an owner-operator team for liner changes and the lifting equipment on site.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Letting the seasonal road-project supply duty be defined verbally instead of in the contract.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  2. Check lubrication levels, grease lines and oil cooler operation.
  3. Check belt tracking, chute build-up and transfer-point dust.
  4. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  5. Record the baseline grading curve for each product fraction.
  6. Test emergency stops, pull wires and interlock trips in sequence.
  7. Measure and log the as-new CSS / setting for future wear comparison.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

PE Series Jaw Crusher in Russia: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PE Series Jaw Crusher be built for 380V 50Hz?

Yes — motors, starters and control panels are specified for 380V 50Hz before manufacture.

Where does HAMAC ship in Russia?

Standard delivery is quoted to St Petersburg; an alternative port can be agreed in the contract.

Do you build plants for seasonal road-project supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

How is pe series jaw crusher sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call