● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PF Impact Crusher for France

PF Impact Crusher supplied to France: published model data, 400V 50Hz motors, NF EN documentation and delivery to Le Havre. HAMAC factory quotation.

Overview

This page brings together the published PF Impact Crusher model data and the practical details of importing it into France — power supply, standards, shipping and commissioning. Popular feed materials in the market include Limestone, Granite.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published PF Impact Crusher data

PF Impact Crusher nominal technical data
Published parameterNominal value
PF-1007Φ1000×700 mm 400×730 mm
PF-1010Φ1000×1050 mm 400×1080 mm
PF-1210Φ1250×1050 mm 400×1080 mm
PF-1214Φ1250×1400 mm 400×1430 mm
PF-1315Φ1320×1500 mm 860×1520 mm
PF-1520Φ1500×2000 mm 830×2040 mm

Local conditions in France

  • Destination port: Le Havre.
  • Site supply: 400V 50Hz.
  • Standards: NF EN.
  • Common materials: Limestone, Granite.
  • Region: Europe.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Le Havre, sets motors and starters to 400V 50Hz, and supplies the certificate set applicable to NF EN. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portLe Havre
Site supply400V 50Hz
Local standardsNF EN
RegionEurope
Machine linePF Impact Crusher
CategoryImpact Crusher
Assumed dutydemolition and recycling duties
Evaluation horizonseven-year view

Treat this as a living sheet. Every revision of the flow sheet for France should update the same fields so the equipment list stays traceable.

Published PF Impact Crusher model data

PF Impact Crusher — nominal published data
ModelRotor sizeFeed openingMax. Feeding sizeCapacityMotor PowerWeightOverall dimension
PF-1007Φ1000×700 mm400×730 mm300 mm30-70 t/h37-45 kW12 t2330×1660×2300 mm
PF-1010Φ1000×1050 mm400×1080 mm350 mm50-90 t/h45-55 kW15 t2370×1700×2390 mm
PF-1210Φ1250×1050 mm400×1080 mm350 mm70-130 t/h110 kW17.7 t2680×2160×2800 mm
PF-1214Φ1250×1400 mm400×1430 mm350 mm100-180 t/h132 kW22.4 t2650×2460×2800 mm
PF-1315Φ1320×1500 mm860×1520 mm500 mm130-250 t/h220 kW27 t3180×2720×2620 mm
PF-1520Φ1500×2000 mm830×2040 mm700 mm300-550 t/h315-400 kW50.6 t3959×3564×3330 mm
PF-1620Φ1600×2000 mm2000×1600 mm500 mm400-700 t/h400-500 kW58 t4259×3660×3450 mm
PF-1820Φ1800×2000 mm1260×2040 mm800 mm600-800 t/h630-710 kW83.21 t4400×3866×4009 mm

The impact crusher (impact crusher) is a new generation of impact crusher developed in combination with the specific working conditions of the sand and gravel. Read the table column by column against demolition and recycling duties: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a remote mine site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectiveminimal civil works
Evaluation horizonseven-year view
Site conditiona remote mine site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for pf impact crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  2. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  3. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  4. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  5. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  6. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  7. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  8. Review the crusher chamber profile with the liner supplier against the feed material.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Control system language, telemetry and remote diagnostics availability.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Liner alloy: high-chrome iron matched to the rock, not to the lowest purchase price.
  • Wear-part interchangeability across machines in the same circuit.
  • Nameplate data for 400V 50Hz and the NF EN certificate set.
  • Closed-side setting range and whether automatic setting regulation is included.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Buying minimal civil works on price alone and losing it in availability.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Overlooking dust, noise and water permits in France until erection has already started.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Dry-run the plant empty for the specified period and record vibration.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Record power draw, tonnage and chamber pressure at steady state.
  4. Measure noise and dust at the operator position against the local limit.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Measure and log the as-new CSS / setting for future wear comparison.
  7. Sample each product fraction and compare with the specification.
  8. Hand over the spare-parts list, manuals and maintenance schedule.

Keep the signed record; it is the only defensible baseline for later performance disputes.

PF Impact Crusher in France: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PF Impact Crusher be built for 400V 50Hz?

Yes — motors, starters and control panels are specified for 400V 50Hz before manufacture.

Where does HAMAC ship in France?

Standard delivery is quoted to Le Havre; an alternative port can be agreed in the contract.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

What documents are needed for France?

Packing list, commercial invoice, bill of lading, certificate of origin and the NF EN documentation applicable to the machine.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call