● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PF Impact Crusher for Brazil

PF Impact Crusher supplied to Brazil: published model data, 380V 60Hz motors, ABNT documentation and delivery to Santos. HAMAC factory quotation.

Overview

This page brings together the published PF Impact Crusher model data and the practical details of importing it into Brazil — power supply, standards, shipping and commissioning. Popular feed materials in the market include Granite, Iron ore.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published PF Impact Crusher data

PF Impact Crusher nominal technical data
Published parameterNominal value
PF-1007Φ1000×700 mm 400×730 mm
PF-1010Φ1000×1050 mm 400×1080 mm
PF-1210Φ1250×1050 mm 400×1080 mm
PF-1214Φ1250×1400 mm 400×1430 mm
PF-1315Φ1320×1500 mm 860×1520 mm
PF-1520Φ1500×2000 mm 830×2040 mm

Local conditions in Brazil

  • Destination port: Santos.
  • Site supply: 380V 60Hz.
  • Standards: ABNT.
  • Common materials: Granite, Iron ore.
  • Region: South America.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Santos, sets motors and starters to 380V 60Hz, and supplies the certificate set applicable to ABNT. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portSantos
Site supply380V 60Hz
Local standardsABNT
RegionSouth America
Machine linePF Impact Crusher
CategoryImpact Crusher
Assumed dutymine pre-beneficiation feed
Evaluation horizonseven-year view

Ask for the same table from any competing supplier; without it, an offer for pf impact crusher cannot be compared on scope.

Published PF Impact Crusher model data

PF Impact Crusher — nominal published data
ModelRotor sizeFeed openingMax. Feeding sizeCapacityMotor PowerWeightOverall dimension
PF-1007Φ1000×700 mm400×730 mm300 mm30-70 t/h37-45 kW12 t2330×1660×2300 mm
PF-1010Φ1000×1050 mm400×1080 mm350 mm50-90 t/h45-55 kW15 t2370×1700×2390 mm
PF-1210Φ1250×1050 mm400×1080 mm350 mm70-130 t/h110 kW17.7 t2680×2160×2800 mm
PF-1214Φ1250×1400 mm400×1430 mm350 mm100-180 t/h132 kW22.4 t2650×2460×2800 mm
PF-1315Φ1320×1500 mm860×1520 mm500 mm130-250 t/h220 kW27 t3180×2720×2620 mm
PF-1520Φ1500×2000 mm830×2040 mm700 mm300-550 t/h315-400 kW50.6 t3959×3564×3330 mm
PF-1620Φ1600×2000 mm2000×1600 mm500 mm400-700 t/h400-500 kW58 t4259×3660×3450 mm
PF-1820Φ1800×2000 mm1260×2040 mm800 mm600-800 t/h630-710 kW83.21 t4400×3866×4009 mm

The impact crusher (impact crusher) is a new generation of impact crusher developed in combination with the specific working conditions of the sand and gravel. Read the table column by column against mine pre-beneficiation feed: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivefast mobilisation
Evaluation horizonseven-year view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for pf impact crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  2. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  3. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  4. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  7. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  8. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  9. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Availability of a mixed local and expatriate team for liner changes and the lifting equipment on site.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Control system language, telemetry and remote diagnostics availability.
  • Wear-part interchangeability across machines in the same circuit.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Nameplate data for 380V 60Hz and the ABNT certificate set.

Share this list with a mixed local and expatriate team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.

Mistakes that cost more than the machine

  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Buying fast mobilisation on price alone and losing it in availability.
  • Using one liner profile for both secondary and tertiary stages.

For mine pre-beneficiation feed, protect the fast mobilisation requirement explicitly in the contract documents.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Measure and log the as-new CSS / setting for future wear comparison.
  3. Calibrate the belt scale and any level probes against a known load.
  4. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  5. Check lubrication levels, grease lines and oil cooler operation.
  6. Test emergency stops, pull wires and interlock trips in sequence.
  7. Sample each product fraction and compare with the specification.
  8. Check hydraulic pressure, accumulator pre-charge and tramp-release function.

For a mixed local and expatriate team, run through this list twice — once with the supervisor and once without.

PF Impact Crusher in Brazil: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PF Impact Crusher be built for 380V 60Hz?

Yes — motors, starters and control panels are specified for 380V 60Hz before manufacture.

Where does HAMAC ship in Brazil?

Standard delivery is quoted to Santos; an alternative port can be agreed in the contract.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Do you build plants for mine pre-beneficiation feed?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call