Overview
Coal (Mohs 2, ~40 MPa) is processed in Mongolia for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Tianjin, 380V 50Hz, MNS.

Coal properties
| Property | Value |
|---|---|
| Mohs | 2 |
| Compressive strength | 40 MPa |
| Abrasion | Low |
| Circuit | impact / jaw with gentle reduction |
In Mongolia
- Port: Tianjin.
- Power: 380V 50Hz.
- Standards: MNS.
Equipment
- PF Impact Crusher
- Mobile Impact Crusher Plant
- Vibrating Feeder
Budget
Send material, capacity and product sizes for a configured FOB/CIF budget to Tianjin.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Coal |
| Mohs hardness | 2 |
| Compressive strength | ~40 MPa |
| Abrasiveness | Low |
| Recommended circuit | impact / jaw with gentle reduction |
| Destination port | Tianjin |
| Site supply | 380V 50Hz |
| Local standards | MNS |
| Region | Asia |
| Assumed duty | mine pre-beneficiation feed |
| Evaluation horizon | three-year view |
Use the table as a checklist when comparing quotations for coal crushing — a lower price often means one of these parameters was quietly reduced.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | mine pre-beneficiation feed |
| Primary objective | maximum mechanical availability |
| Evaluation horizon | three-year view |
| Site condition | an existing quarry bench |
| Operating team | a full-time plant team |
Change any one of these assumptions and the recommended configuration for coal crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
- Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Book container or flat-rack space to Tianjin and prepare the customs document set in advance.
- Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Survey the feed: Coal (Mohs 2, ~40 MPa, low abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
A HAMAC project manager stays with the order from the first data sheet through hand-over in Mongolia.

What to verify before you sign
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Liner alloy: Mn18 with ceramic inserts is a common starting point for coal at low abrasion.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Nameplate data for 380V 50Hz and the MNS certificate set.
- Availability of a full-time plant team for liner changes and the lifting equipment on site.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Erection scope: supervision only, or full civil, mechanical and electrical installation.
- Product sampling points and the lab equipment needed for routine grading checks.
- Choke-feed arrangement: surge bin, feeder control and level indication.
The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 54% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 12% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.
Mistakes that cost more than the machine
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Buying maximum mechanical availability on price alone and losing it in availability.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Letting the mine pre-beneficiation feed duty be defined verbally instead of in the contract.
- Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.
Commissioning checklist
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Confirm all guards, emergency stops and pull-wire switches function.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Measure and log the as-new CSS / setting for future wear comparison.
- Check belt tracking, chute build-up and transfer-point dust.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
The commissioning record becomes the reference for every liner change in the three-year plan.