● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

100–200 TPH Crushing Plant in Nigeria

100–200 TPH crushing plant supplied to Nigeria via Lagos at 415V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 100–200 tph crushing plant is a common size for Nigeria. Main machines: PE/PEW jaw + cone + 3-deck screen. Most common export plant size.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE/PEW jaw + cone + 3-deck screen
  • Shipped to Lagos.
  • Configured to 415V 50Hz / SON.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Nigeria

  • Port: Lagos.
  • Voltage: 415V 50Hz.
  • Standards: SON.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Destination portLagos
Site supply415V 50Hz
Local standardsSON
RegionAfrica
Assumed dutycontinuous quarry production
Evaluation horizonthree-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivefast mobilisation
Evaluation horizonthree-year view
Site conditiona coastal export terminal
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  2. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  3. Lay out the PE/PEW jaw + cone + 3-deck screen arrangement with straight conveyor runs and crane access for liner changes.
  4. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  7. Sequence delivery so foundations cure while the equipment is still in manufacture.
  8. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  9. Size the primary stage for 100–200 t/h with a 10–20% surge allowance — never on nameplate throughput alone.

A HAMAC project manager stays with the order from the first data sheet through hand-over in Nigeria.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Nameplate data for 415V 50Hz and the SON certificate set.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.

For continuous quarry production, give the fast mobilisation line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Freight to Nigeria is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Letting the continuous quarry production duty be defined verbally instead of in the contract.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Dry-run the plant empty for the specified period and record vibration.
  2. Measure and log the as-new CSS / setting for future wear comparison.
  3. Record power draw, tonnage and chamber pressure at steady state.
  4. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  5. Check belt tracking, chute build-up and transfer-point dust.
  6. Confirm the direction and tension of every belt under no load.
  7. Verify rotation direction on every motor before coupling.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

100–200 TPH Crushing Plant in Nigeria — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 100–200 TPH plant to Nigeria?

Yes — to Lagos with SON documentation.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

What documents are needed for Nigeria?

Packing list, commercial invoice, bill of lading, certificate of origin and the SON documentation applicable to the machine.

How is the crushing and screening plant sized for 100–200 t/h?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call