Overview
Mobile impact plus screening recovers rebar-free aggregate on site. In Canada the most frequently processed feed materials are Granite, Aggregates, and equipment is normally delivered through Vancouver on 575V 60Hz supplies.

Materials in scope
- Construction waste — Mohs 3, ~60 MPa, low abrasion
- Concrete & asphalt — Mohs 3, ~50 MPa, low abrasion
Recommended machines
- Mobile Jaw Crusher Plant
- Mobile Impact Crusher Plant
Engineering for Canada
| Item | Reference |
|---|---|
| Port | Vancouver |
| Power | 575V 60Hz |
| Standards | CSA |
| Region | North America |
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Vancouver |
| Site supply | 575V 60Hz |
| Local standards | CSA |
| Region | North America |
| Application | Construction & Demolition Recycling |
| Typical feed | Construction waste, Concrete & asphalt |
| Assumed duty | contract crushing on short-term sites |
| Evaluation horizon | seven-year view |
At contract crushing on short-term sites, the ranking of these parameters changes: lowest cost per tonne usually becomes the deciding constraint rather than the headline tonnage.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | contract crushing on short-term sites |
| Primary objective | lowest cost per tonne |
| Evaluation horizon | seven-year view |
| Site condition | an existing quarry bench |
| Operating team | a rotating shift crew |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
- Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
- Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign
- Nameplate data for 575V 60Hz and the CSA certificate set.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Control system language, telemetry and remote diagnostics availability.
- Whether the quoted t/h is achieved at contract crushing on short-term sites or under ideal laboratory feed.
- Closed-side setting range and whether automatic setting regulation is included.
- Local service partner, technician travel time and visa requirements for Canada.
- Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
- Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
- Guaranteed power draw and the lowest cost per tonne trade-off it implies.
The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.
Mistakes that cost more than the machine
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
- Letting the contract crushing on short-term sites duty be defined verbally instead of in the contract.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
- Overlooking dust, noise and water permits in Canada until erection has already started.
- Using one liner profile for both secondary and tertiary stages.
- Specifying motors for the wrong voltage or frequency and rewinding them on site.
Review the list with a rotating shift crew before the order is placed — they will recognise most of them.
Commissioning checklist
- Measure and log the as-new CSS / setting for future wear comparison.
- Test emergency stops, pull wires and interlock trips in sequence.
- Calibrate the belt scale and any level probes against a known load.
- Confirm the direction and tension of every belt under no load.
- Dry-run the plant empty for the specified period and record vibration.
- Sample each product fraction and compare with the specification.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Check belt tracking, chute build-up and transfer-point dust.
On an existing quarry bench, allow extra time for the dust and noise measurements.