Under 50 TPH Copper ore Crushing Plant

Under 50 TPH Copper ore crushing plant: jaw + cone, capacity 10–50 t/h. HAMAC configuration, equipment list and budget. With equipment tables, selection checks and a buyer FAQ.

Overview

A under 50 tph plant for copper ore (Mohs 4, ~120 MPa, medium abrasion). Recommended circuit: jaw + cone.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Copper ore at this scale

Under 50 TPH Copper ore
Capacity10–50 t/h
MaterialCopper ore (Medium abrasion)
Circuitjaw + cone

Equipment

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher

Notes

Crushed then ground for flotation / SX-EW.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialCopper ore
Mohs hardness4
Compressive strength~120 MPa
AbrasivenessMedium
Recommended circuitjaw + cone
Design capacity10–50 t/h
Typical main linesmall jaw + impact/cone, skid or mobile
Scale noteContractor and pilot scale, fast set-up.
Assumed dutyseasonal road-project supply
Evaluation horizonthree-year view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and three-year operating plan.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivelowest cost per tonne
Evaluation horizonthree-year view
Site conditiona confined urban yard
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for copper ore crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  2. Apply jaw + cone; the reduction mechanism must suit medium abrasion and a compressive strength near 120 MPa.
  3. Sequence delivery so foundations cure while the equipment is still in manufacture.
  4. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  5. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  6. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  7. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  8. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

Shortening this sequence is possible on a confined urban yard, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Wear-part interchangeability across machines in the same circuit.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 10–50 t/h.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Liner alloy: Mn18 with ceramic inserts is a common starting point for copper ore at medium abrasion.
  • Dust and noise control designed to the local emission limits for your market.
  • Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts17%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Letting the seasonal road-project supply duty be defined verbally instead of in the contract.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 10–50 t/h.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Using one liner profile for both secondary and tertiary stages.

Review the list with a rotating shift crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Test emergency stops, pull wires and interlock trips in sequence.
  2. Record the baseline grading curve for each product fraction.
  3. Hand over the spare-parts list, manuals and maintenance schedule.
  4. Check belt tracking, chute build-up and transfer-point dust.
  5. Measure and log the as-new CSS / setting for future wear comparison.
  6. Confirm the direction and tension of every belt under no load.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Record power draw, tonnage and chamber pressure at steady state.

The commissioning record becomes the reference for every liner change in the three-year plan.

Under 50 TPH Copper ore Crushing Plant — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Copper ore at Under 50 TPH?

jaw + cone. Crushed then ground for flotation / SX-EW.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Which wear-part grade should I order?

For copper ore (medium abrasion), Mn22 is a common starting point; HAMAC confirms it in the technical proposal.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.