Technical long-tail guide

50–100 TPH Crushing Plant in Japan

50–100 TPH crushing plant supplied to Japan via Yokohama at 200V 50/60Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 50–100 tph crushing plant is a common size for Japan. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE jaw + PF impact / cone + 2-deck screen
  • Shipped to Yokohama.
  • Configured to 200V 50/60Hz / JIS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Japan

  • Port: Yokohama.
  • Voltage: 200V 50/60Hz.
  • Standards: JIS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Destination portYokohama
Site supply200V 50/60Hz
Local standardsJIS
RegionAsia
Assumed dutycontract crushing on short-term sites
Evaluation horizonsingle-project view

At contract crushing on short-term sites, the ranking of these parameters changes: tight grading compliance usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontract crushing on short-term sites
Primary objectivetight grading compliance
Evaluation horizonsingle-project view
Site conditiona confined urban yard
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  2. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  3. Book container or flat-rack space to Yokohama and prepare the customs document set in advance.
  4. Specify motors, starters and documentation for 200V 50/60Hz and JIS before manufacture.
  5. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  8. Confirm the haul-road and stockpile plan with a confined urban yard in mind before fixing conveyor lengths.
  9. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Availability of an owner-operator team for liner changes and the lifting equipment on site.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.

For contract crushing on short-term sites, give the tight grading compliance line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Overlooking dust, noise and water permits in Japan until erection has already started.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 50–100 t/h.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a confined urban yard.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Dry-run the plant empty for the specified period and record vibration.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Test emergency stops, pull wires and interlock trips in sequence.
  4. Sample each product fraction and compare with the specification.
  5. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  6. Hand over the spare-parts list, manuals and maintenance schedule.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

The commissioning record becomes the reference for every liner change in the single-project plan.

50–100 TPH Crushing Plant in Japan — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 50–100 TPH plant to Japan?

Yes — to Yokohama with JIS documentation.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

What documents are needed for Japan?

Packing list, commercial invoice, bill of lading, certificate of origin and the JIS documentation applicable to the machine.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.