● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

200–300 TPH Crushing Plant in Egypt

200–300 TPH crushing plant supplied to Egypt via Alexandria at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 200–300 tph crushing plant is a common size for Egypt. Main machines: large jaw + 2× cone + screens. Mid-size quarry, multiple products.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • large jaw + 2× cone + screens
  • Shipped to Alexandria.
  • Configured to 380V 50Hz / EOS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Egypt

  • Port: Alexandria.
  • Voltage: 380V 50Hz.
  • Standards: EOS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity200–300 t/h
Typical main linelarge jaw + 2× cone + screens
Scale noteMid-size quarry, multiple products.
Destination portAlexandria
Site supply380V 50Hz
Local standardsEOS
RegionAfrica
Assumed dutymanufactured-sand production
Evaluation horizonten-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivetight grading compliance
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  2. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  3. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  4. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  5. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  6. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  7. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  8. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

Shortening this sequence is possible on a brownfield extension, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 200–300 t/h.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Availability of a mixed local and expatriate team for liner changes and the lifting equipment on site.

For manufactured-sand production, give the tight grading compliance line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.

Mistakes that cost more than the machine

  • Overlooking dust, noise and water permits in Egypt until erection has already started.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Buying tight grading compliance on price alone and losing it in availability.

Review the list with a mixed local and expatriate team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  2. Check belt tracking, chute build-up and transfer-point dust.
  3. Confirm all guards, emergency stops and pull-wire switches function.
  4. Check lubrication levels, grease lines and oil cooler operation.
  5. Record the baseline grading curve for each product fraction.
  6. Hand over the spare-parts list, manuals and maintenance schedule.
  7. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  8. Test emergency stops, pull wires and interlock trips in sequence.

The commissioning record becomes the reference for every liner change in the ten-year plan.

200–300 TPH Crushing Plant in Egypt — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 200–300 TPH plant to Egypt?

Yes — to Alexandria with EOS documentation.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

What documents are needed for Egypt?

Packing list, commercial invoice, bill of lading, certificate of origin and the EOS documentation applicable to the machine.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call