Technical long-tail guide

50–100 TPH Crushing Plant Layout

50–100 TPH Crushing Plant Layout & Site Requirements. HAMAC PE jaw + PF impact / cone + 2-deck screen. Free flow sheet and quotation within 24 hours.

Overview

A 50–100 tph crushing plant is one of the most requested export sizes. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Site requirements

  • Level pad ~800–1,500 m².
  • Power: standard grid at local voltage.
  • Water for dust control (if fitted).
  • Stockpile and truck-loading space.

Civil work

Foundations are referenced from the HAMAC general layout; a geotechnical check is recommended for > 300 t/h plants.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Assumed dutymanufactured-sand production
Evaluation horizonfive-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivefast mobilisation
Evaluation horizonfive-year view
Site conditiona remote mine site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Book shipping, prepare the packing list and confirm the container loading plan.
  2. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  3. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  4. Lay out the PE jaw + PF impact / cone + 2-deck screen arrangement with straight conveyor runs and crane access for liner changes.
  5. Sequence delivery so foundations cure while the equipment is still in manufacture.
  6. Confirm the haul-road and stockpile plan with a remote mine site in mind before fixing conveyor lengths.
  7. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  8. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  9. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.

For a mixed local and expatriate team, the commissioning and training steps need more calendar time than the mechanical erection itself.

What to verify before you sign

  • Product sampling points and the lab equipment needed for routine grading checks.
  • Availability of a mixed local and expatriate team for liner changes and the lifting equipment on site.
  • Wear-part interchangeability across machines in the same circuit.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Control system language, telemetry and remote diagnostics availability.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Skipping a geotechnical check and discovering settlement under the primary crusher at a remote mine site.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.

Review the list with a mixed local and expatriate team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  2. Confirm the direction and tension of every belt under no load.
  3. Calibrate the belt scale and any level probes against a known load.
  4. Hand over the spare-parts list, manuals and maintenance schedule.
  5. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  6. Measure noise and dust at the operator position against the local limit.
  7. Record power draw, tonnage and chamber pressure at steady state.
  8. Check belt tracking, chute build-up and transfer-point dust.

The commissioning record becomes the reference for every liner change in the five-year plan.

50–100 TPH Crushing Plant Layout & Site Requirements — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a 50–100 TPH plant?

PE jaw + PF impact / cone + 2-deck screen

How much does a 50–100 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call