100–200 TPH Crushing Plant Configuration

100–200 TPH Crushing Plant Configuration & Equipment List. HAMAC PE/PEW jaw + cone + 3-deck screen. Free flow sheet and quotation within 24 hours.

Overview

A 100–200 tph crushing plant is one of the most requested export sizes. Main machines: PE/PEW jaw + cone + 3-deck screen. Most common export plant size.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE/PEW jaw + cone + 3-deck screen
  • Feeders and a screen for 2–3 products.
  • Conveyors, control cabinet and (recommended) dust suppression.

How to select

  • Base capacity on SALEABLE t/h at required sizes, +10–20% surge.
  • Hard rock → jaw + cone; soft rock → jaw + impact.
  • Add VSI only when sand / shape is required.

100–200 TPH reference

100–200 TPH reference
Capacity bandTypical main machinesNote
100–200 TPHPE/PEW jaw + cone + 3-deck screenMost common export plant size.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Assumed dutycontinuous quarry production
Evaluation horizonten-year view

These values are the starting point for a written proposal on the crushing and screening plant; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivestrict product cubicity
Evaluation horizonten-year view
Site conditiona remote mine site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Confirm the haul-road and stockpile plan with a remote mine site in mind before fixing conveyor lengths.
  2. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  3. Review the crusher chamber profile with the liner supplier against the feed material.
  4. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  5. Book shipping, prepare the packing list and confirm the container loading plan.
  6. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  8. Size the primary stage for 100–200 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
  9. Lay out the PE/PEW jaw + cone + 3-deck screen arrangement with straight conveyor runs and crane access for liner changes.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Control system language, telemetry and remote diagnostics availability.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Local service partner, technician travel time and visa requirements for your market.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 100–200 t/h.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

A ten-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.

Mistakes that cost more than the machine

  • Undersizing the screen, then blaming the crusher for a plant that never reaches 100–200 t/h.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a remote mine site.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Letting the continuous quarry production duty be defined verbally instead of in the contract.
  • Using one liner profile for both secondary and tertiary stages.
  • Comparing quotations with different port terms and calling the lower number cheaper.

Review the list with a rotating shift crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure noise and dust at the operator position against the local limit.
  2. Calibrate the belt scale and any level probes against a known load.
  3. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  4. Test emergency stops, pull wires and interlock trips in sequence.
  5. Record power draw, tonnage and chamber pressure at steady state.
  6. Verify rotation direction on every motor before coupling.
  7. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  8. Confirm the direction and tension of every belt under no load.

The commissioning record becomes the reference for every liner change in the ten-year plan.

100–200 TPH Crushing Plant Configuration & Equipment List — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a 100–200 TPH plant?

PE/PEW jaw + cone + 3-deck screen

How much does a 100–200 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.