Design basis for marble greenfield plant
The design basis starts with the rock, not the machine. Marble is rated at 50–120 MPa compressive strength with low abrasiveness, low moisture sensitivity and a loose bulk density around 1.40 t/m³. Valued for whiteness, so iron contamination and tramp metal protection matter more than reduction ratio. A change in one stage changes the circulating load in all the others.
A greenfield plant must fix the entire flow sheet before civil works begin, constrained by an untested feed gradation and a fixed commissioning date. The commercial priority is a verifiable mass balance. For this combination HAMAC works from an indicative design point of 210 t/h of saleable product, with a maximum feed top size near 550 mm and target fractions of ground calcium carbonate, chips, aggregate.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Marble · 50–120 MPa · abrasion low |
| Design throughput | 210 t/h saleable product (200–400 t/h scenario band) |
| Maximum feed size | ~550 mm |
| Target product | ground calcium carbonate, chips, aggregate |
| Loose bulk density | 1.40 t/m³ |
| Suggested circuit | jaw → impact → screen → grinding / classifier |

Why powder moisture and caking appears in this circuit
Powder cakes in the silo and the finished product moisture drifts upward. In a marble greenfield plant this is usually a system symptom rather than a single machine fault. The answer depends on the mass balance, not on a catalogue capacity figure.
- feed surface moisture rises after rain or washing
- hot-air volume is insufficient for the evaporation load
- duct condensation forms at cold starts
Operator notes from the first month are often the best diagnostic data. Before changing a crusher setting, check these in order: 1) measure feed and product moisture each shift; 2) log mill outlet temperature; 3) inspect ducting and the bag hopper for condensation. Confirm all figures in a written proposal before purchase.
Recommended equipment configuration
For marble at 210 t/h the working train is jaw → impact → screen → grinding / classifier. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for marble and for a softer rock. A change in one stage changes the circulating load in all the others.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~263 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~26 mm at the secondary stage |
| Secondary / tertiary | impact |
| Screening | Multi-deck screen sized for 30% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 1.40 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 570 kW order-of-magnitude connected load |
The corrective actions for powder moisture and caking are applied on top of this base circuit: add or uprate the drying stage and meter inlet moisture; balance hot-air volume with feed rate and outlet temperature; pre-heat the circuit and insulate cold duct sections.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 26 mm, a circulating load around 30% and a screen efficiency target above 90%. Operator notes from the first month are often the best diagnostic data.
- Measure feed and product moisture each shift
- Log mill outlet temperature
- Inspect ducting and the bag hopper for condensation
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 210 t/h nominal |
| Grading | Full sieve analysis, agreed standard, ground calcium carbonate, chips, aggregate |
| Crusher setting | CSS measured and logged, ~26 mm starting point |
| Power | Main-drive current at steady feed, 570 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for marble, while a verifiable mass balance determines how much lost production actually costs. The answer depends on the mass balance, not on a catalogue capacity figure.
- Ask every supplier for the same flow sheet and mass balance, including the 30% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 210 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
A change in one stage changes the circulating load in all the others. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.