Andesite contract crushing: Off-specification grading — solution & design basis

The product sieve curve drifts outside its envelope between shifts — a 120 t/h design basis, configuration and acceptance checks.

Andesite contract crushing with off-specification grading is normally resolved by checking the circuit against the saleable product specification first: measure and log CSS after every liner change. For a 120 t/h design point on andesite, HAMAC would review jaw → cone → VSI → screen, then confirm the settings with a written acceptance test. A supplier can only guarantee a figure when the test conditions are written down.

120 t/hindicative design point
120–240 MPacompressive strength
80–200 t/hscenario capacity band
290 kWorder-of-magnitude installed power
Key takeaways
  1. Andesite is medium–high in abrasiveness and low in moisture sensitivity; Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification.
  2. For contract crushing the priority is mobility and fast set-up, constrained by short project duration and no permanent foundations.
  3. Off-specification grading typically appears as: the product sieve curve drifts outside its envelope between shifts.
  4. First corrective action: measure and log CSS after every liner change.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for andesite contract crushing

The design basis starts with the rock, not the machine. Andesite is rated at 120–240 MPa compressive strength with medium–high abrasiveness, low moisture sensitivity and a loose bulk density around 1.44 t/m³. Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification. Indicative values are starting points for a design, not guarantees.

A contract crushing must relocate between sites with minimal erection time, constrained by short project duration and no permanent foundations. The commercial priority is mobility and fast set-up. For this combination HAMAC works from an indicative design point of 120 t/h of saleable product, with a maximum feed top size near 300 mm and target fractions of asphalt aggregate, 0–5, 5–16 mm.

Andesite — design basis (nominal values)
ParameterIndicative value / method
Raw materialAndesite · 120–240 MPa · abrasion medium–high
Design throughput120 t/h saleable product (80–200 t/h scenario band)
Maximum feed size~300 mm
Target productasphalt aggregate, 0–5, 5–16 mm
Loose bulk density1.44 t/m³
Suggested circuitjaw → cone → VSI → screen
Andesite contract crushing — Design basis for andesite contract crushing — HAMAC vibrating screen
Andesite contract crushing — Design basis for andesite contract crushing — HAMAC vibrating screen reference.

Why off-specification grading appears in this circuit

The product sieve curve drifts outside its envelope between shifts. In a andesite contract crushing this is usually a system symptom rather than a single machine fault. A supplier can only guarantee a figure when the test conditions are written down.

  • CSS has moved as liners wear and was not re-measured
  • screen media is worn, blinded or stretched
  • feed gradation changes as the quarry face advances

Operator notes from the first month are often the best diagnostic data. Before changing a crusher setting, check these in order: 1) run a full sieve analysis on each product fraction; 2) compare current CSS with the commissioning log; 3) inspect every deck for torn or blinded panels. Agree the acceptance test and sampling method before the order is placed.

Recommended equipment configuration

For andesite at 120 t/h the working train is jaw → cone → VSI → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for andesite and for a softer rock. Indicative values are starting points for a design, not guarantees.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~150 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~42 mm at the secondary stage
Secondary / tertiarycone
ScreeningMulti-deck screen sized for 60% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.44 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 290 kW order-of-magnitude connected load

The corrective actions for off-specification grading are applied on top of this base circuit: measure and log css after every liner change; set a screen-panel replacement interval based on aperture wear; adjust the closed-circuit return rate before changing the crusher setting.

Andesite contract crushing — Recommended equipment configuration — HAMAC vibrating screen
Andesite contract crushing — Recommended equipment configuration — HAMAC vibrating screen reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 42 mm, a circulating load around 60% and a screen efficiency target above 90%. Operator notes from the first month are often the best diagnostic data.

  • Run a full sieve analysis on each product fraction
  • Compare current CSS with the commissioning log
  • Inspect every deck for torn or blinded panels
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 120 t/h nominal
GradingFull sieve analysis, agreed standard, asphalt aggregate, 0–5, 5–16 mm
Crusher settingCSS measured and logged, ~42 mm starting point
PowerMain-drive current at steady feed, 290 kW connected load
WearLiner mass before and after, cost per saleable tonne

Agree the acceptance test and sampling method before the order is placed. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for andesite, while mobility and fast set-up determines how much lost production actually costs. A supplier can only guarantee a figure when the test conditions are written down.

  • Ask every supplier for the same flow sheet and mass balance, including the 60% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 120 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Indicative values are starting points for a design, not guarantees. Agree the acceptance test and sampling method before the order is placed. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Andesite contract crushing — Cost, risk and what to confirm in writing — HAMAC vibrating screen
Andesite contract crushing — Cost, risk and what to confirm in writing — HAMAC vibrating screen reference.
FAQ

Andesite contract crushing — questions answered

Direct answers to the questions buyers ask most often.

What causes off-specification grading in a andesite contract crushing?

The product sieve curve drifts outside its envelope between shifts. The usual causes are css has moved as liners wear and was not re-measured; screen media is worn, blinded or stretched; feed gradation changes as the quarry face advances. measure and log CSS after every liner change.

Which crusher train suits andesite at 80–200 t/h?

A typical configuration is jaw → cone → VSI → screen. Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 120 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.