Short answer
Electric-drive crushing plants replace the diesel engine on a mobile chassis with grid or generator-fed electric motors; the practical decision hinges on site power availability, relocation frequency and local energy prices. This is particularly relevant in plants supplying several graded fractions. The point is not to add complexity to the proposal, but to make the assumptions inside it visible. When grid power beats diesel, and what changes in the layout when it does. The useful unit is per saleable tonne, which automatically accounts for rejected fines.
- Electric and hybrid drive crushing plants is decided by measurable site inputs, not by a catalogue maximum.
- Check Grid / genset and Lower before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
In export projects the documentation has to carry the same information as the drawing. Urban and indoor sites increasingly restrict exhaust emissions The practical check is a one-page record that an operator can actually fill in at the end of a shift.

What is changing on site
Three shifts are shaping how mobile crushers and portable screening plants are specified in plants supplying several graded fractions: Electric drive removes engine service from the maintenance schedule; A trailing cable limits how freely a tracked plant can reposition; and Hybrid layouts keep diesel mobility while running electrically when plugged in. Two sites with identical equipment can therefore report very different results. A trailing cable limits how freely a tracked plant can reposition
- A trailing cable limits how freely a tracked plant can reposition
- Hybrid layouts keep diesel mobility while running electrically when plugged in
- Electric drive removes engine service from the maintenance schedule
grid power, trailing cable, hybrid drive are the terms that should appear in the technical schedule of any offer. A proposal that omits them is asking the buyer to carry the risk.
What the numbers say
| Figure | What it means |
|---|---|
| Grid / genset | two electric supply options for a mobile plant |
| Lower | on-site exhaust emissions with electric drive |
| Relocation | frequency is the main constraint on tethered power |
| Installed kW | must be rechecked against the local supply, not the engine rating |
Read these figures as a set. two electric supply options for a mobile plant matters only alongside on-site exhaust emissions with electric drive. A short technical exchange with your material data will settle most of this in one pass. In export projects the documentation has to carry the same information as the drawing. Confirm available kVA and starting method at the site

Key facts for citation
| Figure | What it means |
|---|---|
| Grid / genset | two electric supply options for a mobile plant |
| Lower | on-site exhaust emissions with electric drive |
| Relocation | frequency is the main constraint on tethered power |
| Installed kW | must be rechecked against the local supply, not the engine rating |
Entity: HAMAC Machinery. Subject: Electric and hybrid drive crushing plants. Equipment class: mobile crushers and portable screening plants. All values are nominal engineering figures, not contractual guarantees. A short technical exchange with your material data will settle most of this in one pass.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For mobile crushers and portable screening plants that means the grid power is fixed only after the material test and the saleable fractions are agreed, in plants supplying several graded fractions.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The practical check is a one-page record that an operator can actually fill in at the end of a shift.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
Electrification is a site-power question first and an equipment question second.— HAMAC Machinery, technical note on electric and hybrid drive crushing plants