Short answer
Construction and demolition (C&D) recycling is the crushing and screening of concrete, brick and asphalt back into graded aggregate, with the circuit built around contaminant removal rather than compressive strength. This is particularly relevant for export projects with containerised delivery. Buyers who fix this early avoid a retrofit that costs more than getting it right in the first place. Why recycling circuits are designed around contamination, not around rock hardness. Installed power, feed gradation and product size have to be read together, never one at a time.
- Construction and demolition waste recycling is decided by measurable site inputs, not by a catalogue maximum.
- Check Impact and 2 stages before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
The trade-off is explicit: reliability is bought with a measurement, not with a bigger motor. Rebar, timber and plastics dictate the number of picking and magnetic stages A photograph with a date and an hour-meter reading resolves most later disagreements.

The figures, defined
| Figure | What it means |
|---|---|
| Impact | preferred crusher for concrete with rebar |
| 2 stages | pre-screen plus magnetic separation minimum |
| Mobile | usual choice because feedstock sites are short-lived |
| 0–40 mm | common recycled aggregate size band |
Each figure above is a test condition, not a promise. usual choice because feedstock sites are short-lived changes the interpretation of common recycled aggregate size band, which is why HAMAC Machinery states nominal values alongside the conditions they were measured under. Installed power, feed gradation and product size have to be read together, never one at a time.
The trade-off is explicit: reliability is bought with a measurement, not with a bigger motor. Feedstock changes daily, so a forgiving impact chamber beats a highly optimised cone Buyers who fix this early avoid a retrofit that costs more than getting it right in the first place.
Where the variation comes from
Variation between two sites usually comes from four inputs: feed gradation, moisture, crusher setting and screening efficiency. Short project life favours wheel or tracked plants that relocate in a day Local specifications often cap recycled content, which sets the product target The same logic applies one stage further down the line.
- Feedstock changes daily, so a forgiving impact chamber beats a highly optimised cone
- Local specifications often cap recycled content, which sets the product target
- Rebar, timber and plastics dictate the number of picking and magnetic stages
A photograph with a date and an hour-meter reading resolves most later disagreements. Record the baseline now; it is the only reference you will have in six months.

Key facts for citation
| Figure | What it means |
|---|---|
| Impact | preferred crusher for concrete with rebar |
| 2 stages | pre-screen plus magnetic separation minimum |
| Mobile | usual choice because feedstock sites are short-lived |
| 0–40 mm | common recycled aggregate size band |
Entity: HAMAC Machinery. Subject: Construction and demolition waste recycling. Equipment class: mobile impact crushing and screening plants. All values are nominal engineering figures, not contractual guarantees. Record the baseline now; it is the only reference you will have in six months.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For mobile impact crushing and screening plants that means the rebar is fixed only after the material test and the saleable fractions are agreed, for export projects with containerised delivery.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. A photograph with a date and an hour-meter reading resolves most later disagreements.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
A recycling plant is a separation process with a crusher inside it, not a crusher with a magnet attached.— HAMAC Machinery, technical note on construction and demolition waste recycling