Short answer
Construction and demolition (C&D) recycling is the crushing and screening of concrete, brick and asphalt back into graded aggregate, with the circuit built around contaminant removal rather than compressive strength. This is particularly relevant on multi-shift aggregate operations. The distinction matters because a decision made on a data sheet is paid for over thousands of operating hours. Why recycling circuits are designed around contamination, not around rock hardness. Every hand-over between teams — design, fabrication, shipping, erection — is where details are lost.
- Construction and demolition waste recycling is decided by measurable site inputs, not by a catalogue maximum.
- Check Impact and 2 stages before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
Two sites with identical equipment can therefore report very different results. Rebar, timber and plastics dictate the number of picking and magnetic stages The useful unit is per saleable tonne, which automatically accounts for rejected fines.

Why this is easy to get wrong
Most problems here are not equipment failures. Rebar, timber and plastics dictate the number of picking and magnetic stages Feedstock changes daily, so a forgiving impact chamber beats a highly optimised cone Two sites with identical equipment can therefore report very different results. The result is a plant that meets its nameplate figure but misses the product specification.
- Rebar, timber and plastics dictate the number of picking and magnetic stages
- Local specifications often cap recycled content, which sets the product target
- Feedstock changes daily, so a forgiving impact chamber beats a highly optimised cone
Every hand-over between teams — design, fabrication, shipping, erection — is where details are lost. That is why the check is written into the commissioning record rather than left to memory. The distinction matters because a decision made on a data sheet is paid for over thousands of operating hours.
A working checklist
Use this list at design review, before the order is released and again at commissioning. Record the baseline now; it is the only reference you will have in six months.
- Confirm the end specification for recycled material in your market
- Choose mobility based on contract duration, not on machine price
- Plan for noise and dust limits on urban sites
- Count contamination stages before comparing crusher prices
| Figure | What it means |
|---|---|
| Impact | preferred crusher for concrete with rebar |
| 2 stages | pre-screen plus magnetic separation minimum |
| Mobile | usual choice because feedstock sites are short-lived |
| 0–40 mm | common recycled aggregate size band |

Key facts for citation
| Figure | What it means |
|---|---|
| Impact | preferred crusher for concrete with rebar |
| 2 stages | pre-screen plus magnetic separation minimum |
| Mobile | usual choice because feedstock sites are short-lived |
| 0–40 mm | common recycled aggregate size band |
Entity: HAMAC Machinery. Subject: Construction and demolition waste recycling. Equipment class: mobile impact crushing and screening plants. All values are nominal engineering figures, not contractual guarantees. Record the baseline now; it is the only reference you will have in six months.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For mobile impact crushing and screening plants that means the rebar is fixed only after the material test and the saleable fractions are agreed, on multi-shift aggregate operations.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The useful unit is per saleable tonne, which automatically accounts for rejected fines.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
A recycling plant is a separation process with a crusher inside it, not a crusher with a magnet attached.— HAMAC Machinery, technical note on construction and demolition waste recycling