Overview
Gabbro crushing plant cost scales with capacity, mobility and wear-package grade. The table below gives an indicative bracket by plant size.

Indicative cost by capacity
| Plant size | Indicative scope | Cost driver |
|---|---|---|
| < 100 t/h | mobile jaw + screen | mobility & simplicity |
| 100–300 t/h | jaw + cone + screens | model size & liners |
| > 500 t/h | multi-stage stationary | throughput & automation |
What moves the price
- Capacity and number of crushing stages.
- Mobility (stationary < wheel < tracked).
- Wear-part grade and spare-parts package.
- Screen area, conveyors and dust control.
Get a budget
Send material, feed size, target t/h and products for a configured FOB / CIF budget within 24 hours.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Gabbro |
| Mohs hardness | 6 |
| Compressive strength | ~180 MPa |
| Abrasiveness | High |
| Recommended circuit | jaw + cone |
| Assumed duty | high-tonnage aggregate supply |
| Evaluation horizon | five-year view |
Ask for the same table from any competing supplier; without it, an offer for gabbro crushing cannot be compared on scope.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | high-tonnage aggregate supply |
| Primary objective | lowest cost per tonne |
| Evaluation horizon | five-year view |
| Site condition | a brownfield extension |
| Operating team | an owner-operator team |
Change any one of these assumptions and the recommended configuration for gabbro crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Review the crusher chamber profile with the liner supplier against Gabbro (Mohs 6, ~180 MPa, high abrasion).
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Survey the feed: Gabbro (Mohs 6, ~180 MPa, high abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Book shipping, prepare the packing list and confirm the container loading plan.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
- Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
- Product sampling points and the lab equipment needed for routine grading checks.
- Guaranteed power draw and the lowest cost per tonne trade-off it implies.
- Availability of an owner-operator team for liner changes and the lifting equipment on site.
- Closed-side setting range and whether automatic setting regulation is included.
- Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
- Local service partner, technician travel time and visa requirements for your market.
- Choke-feed arrangement: surge bin, feeder control and level indication.
For high-tonnage aggregate supply, give the lowest cost per tonne line extra weight; a generic checklist will not rank the offers correctly.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 51% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 19% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.
Mistakes that cost more than the machine
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Buying lowest cost per tonne on price alone and losing it in availability.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
Review the list with an owner-operator team before the order is placed — they will recognise most of them.
Commissioning checklist
- Sample each product fraction and compare with the specification.
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Check lubrication levels, grease lines and oil cooler operation.
- Confirm the direction and tension of every belt under no load.
- Measure and log the as-new CSS / setting for future wear comparison.
- Check belt tracking, chute build-up and transfer-point dust.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Calibrate the belt scale and any level probes against a known load.
For an owner-operator team, run through this list twice — once with the supervisor and once without.