● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Straight-Through Centrifugal Mill Applications

Where a Straight-Through Centrifugal Mill is used: materials it handles, industries it serves and typical plant configurations across aggregates, mining and recycling.

Overview

The Straight-Through Centrifugal Mill is applied across aggregates, mining, beneficiation and recycling. The material properties decide whether it is the right machine.

Overview — HAMAC crushing and grinding equipment reference
Overview — HAMAC crushing and grinding equipment reference.

Materials it handles

  • Hard rock: granite, basalt, andesite, gabbro.
  • Soft rock: limestone, marble, dolomite.
  • Ores: iron, copper, gold, manganese.
  • Recycling: concrete, asphalt, C&D waste.

Industries

  • Quarrying and construction aggregates.
  • Metal ore crushing and beneficiation.
  • Manufactured sand and road base.
  • Cement raw meal and industrial minerals.

Typical configuration

Usually combined with a feeder, screen and conveyors into a complete circuit, or as a module in a mobile plant.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineStraight-Through Centrifugal Mill
CategoryGrinding Mills
Assumed dutydemolition and recycling duties
Evaluation horizonsingle-project view

These values are the starting point for a written proposal on straight-through centrifugal mill; they are nominal and should be confirmed against a sample test before manufacture.

Published Straight-Through Centrifugal Mill model data

Straight-Through Centrifugal Mill — nominal published data
ParameterTypical valueEngineering note
Finished fineness0-3 mm coarse powderSet at the classifier
Nominal capacity15-90 t/hVaries with material and moisture
Maximum feed size40-80 mmRequires pre-crushing
Typical materialsLimestone, calcite, gypsum, talc, bariteMohs <= 7, moisture <= 6%
Power supply380 / 415 / 440 V, 50 or 60 HzConfigured to destination grid

Straight-Through Centrifugal Mill for manufactured sand correction, dry-mix mortar and coarse mineral powder, producing 0-3 mm coarse powder at 15-90 t/h with an integrated classifier and dust collection. Read the table column by column against demolition and recycling duties: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivelowest cost per tonne
Evaluation horizonsingle-project view
Site conditiona greenfield site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for straight-through centrifugal mill may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  2. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  3. Review the crusher chamber profile with the liner supplier against the feed material.
  4. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  5. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  8. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  9. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.

A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the single-project review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.

Mistakes that cost more than the machine

  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Overlooking dust, noise and water permits in your market until erection has already started.

On a greenfield site, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Check lubrication levels, grease lines and oil cooler operation.
  2. Dry-run the plant empty for the specified period and record vibration.
  3. Record the baseline grading curve for each product fraction.
  4. Confirm the direction and tension of every belt under no load.
  5. Hand over the spare-parts list, manuals and maintenance schedule.
  6. Confirm all guards, emergency stops and pull-wire switches function.
  7. Measure noise and dust at the operator position against the local limit.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

For a full-time plant team, run through this list twice — once with the supervisor and once without.

Straight-Through Centrifugal Mill Applications & Suitable Materials — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can a Straight-Through Centrifugal Mill produce manufactured sand?

For sand, a VSI is the shaping stage after the Straight-Through Centrifugal Mill; the two are often paired in a complete line.

Is it suitable for recycling?

With a magnet and proper feed control, yes — especially impact-based units for concrete and asphalt.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call