Overview
Mobile impact plants recover rebar-free aggregate from demolition concrete and RAP asphalt directly on site in Zambia, cutting haulage and landfill cost.

Scope of supply
- Tracked or wheel impact crusher with a magnet.
- Grizzly / scalping screen to remove fines and soil.
- Air separation for light contaminants.
- Closed-loop water where washing is required.
- Product certification to local ZS grading.
Market parameters for Zambia
| Item | Reference |
|---|---|
| Region | Africa |
| Port | Dar es Salaam |
| Voltage / frequency | 380V 50Hz |
| Standards | ZS |
| Typical feed | Copper ore, Cobalt |
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Concrete & asphalt |
| Mohs hardness | 3 |
| Compressive strength | ~50 MPa |
| Abrasiveness | Low |
| Recommended circuit | mobile impact + screen |
| Destination port | Dar es Salaam |
| Site supply | 380V 50Hz |
| Local standards | ZS |
| Region | Africa |
| Assumed duty | manufactured-sand production |
| Evaluation horizon | seven-year view |
The figures above are transcribed from published HAMAC data and from the material properties of concrete & asphalt; site measurements take precedence.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | manufactured-sand production |
| Primary objective | simple operator maintenance |
| Evaluation horizon | seven-year view |
| Site condition | a coastal export terminal |
| Operating team | a full-time plant team |
Change any one of these assumptions and the recommended configuration for concrete & asphalt crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Specify motors, starters and documentation for 380V 50Hz and ZS before manufacture.
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
- Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
- Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.
What to verify before you sign
- Energy draw in kW and the expected kWh per tonne at the design duty.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
- Product sampling points and the lab equipment needed for routine grading checks.
- Decommissioning or relocation value at the end of a seven-year horizon.
- Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
- Written performance guarantee, sampling method and acceptance-test protocol.
- Dust and noise control designed to the local emission limits for Zambia.
Score each supplier against the same ten items and keep the score sheet with the purchase file for the seven-year review.

Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 13% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.
Mistakes that cost more than the machine
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a coastal export terminal.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
On a coastal export terminal, the civil and logistics items deserve as much attention as the crusher itself.
Commissioning checklist
- Check belt tracking, chute build-up and transfer-point dust.
- Calibrate the belt scale and any level probes against a known load.
- Measure noise and dust at the operator position against the local limit.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Record the baseline grading curve for each product fraction.
- Dry-run the plant empty for the specified period and record vibration.
On a coastal export terminal, allow extra time for the dust and noise measurements.