● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Concrete & Asphalt Recycling Crusher in Pakistan

Concrete & Asphalt Recycling Crusher in Pakistan — HAMAC equipment, delivery to Karachi, 400V 50Hz power and PSQCA documentation. Request a configured quotation.

Overview

Mobile impact plants recover rebar-free aggregate from demolition concrete and RAP asphalt directly on site in Pakistan, cutting haulage and landfill cost.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Scope of supply

  • Tracked or wheel impact crusher with a magnet.
  • Grizzly / scalping screen to remove fines and soil.
  • Air separation for light contaminants.
  • Closed-loop water where washing is required.
  • Product certification to local PSQCA grading.

Market parameters for Pakistan

Pakistan reference data
ItemReference
RegionAsia
PortKarachi
Voltage / frequency400V 50Hz
StandardsPSQCA
Typical feedLimestone, Coal

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialConcrete & asphalt
Mohs hardness3
Compressive strength~50 MPa
AbrasivenessLow
Recommended circuitmobile impact + screen
Destination portKarachi
Site supply400V 50Hz
Local standardsPSQCA
RegionAsia
Assumed dutymine pre-beneficiation feed
Evaluation horizonten-year view

Treat this as a living sheet. Every revision of the flow sheet for Pakistan should update the same fields so the equipment list stays traceable.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivelowest cost per tonne
Evaluation horizonten-year view
Site conditiona remote mine site
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for concrete & asphalt crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Sequence delivery so foundations cure while the equipment is still in manufacture.
  2. Specify motors, starters and documentation for 400V 50Hz and PSQCA before manufacture.
  3. Review the crusher chamber profile with the liner supplier against Concrete & asphalt (Mohs 3, ~50 MPa, low abrasion).
  4. Confirm the haul-road and stockpile plan with a remote mine site in mind before fixing conveyor lengths.
  5. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  8. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  9. Book container or flat-rack space to Karachi and prepare the customs document set in advance.

For an owner-operator team, the commissioning and training steps need more calendar time than the mechanical erection itself.

What to verify before you sign

  • Control system language, telemetry and remote diagnostics availability.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Whether the quoted t/h is achieved at mine pre-beneficiation feed or under ideal laboratory feed.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.

Ask each supplier to price the same list. Quotations for concrete & asphalt crushing only become comparable when the scope is identical.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts13%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.

Mistakes that cost more than the machine

  • Letting the mine pre-beneficiation feed duty be defined verbally instead of in the contract.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Using one liner profile for both secondary and tertiary stages.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Assuming the manufacturer's warranty covers wear parts and consumables.

For mine pre-beneficiation feed, protect the lowest cost per tonne requirement explicitly in the contract documents.

Commissioning checklist

  1. Check lubrication levels, grease lines and oil cooler operation.
  2. Confirm the direction and tension of every belt under no load.
  3. Record the baseline grading curve for each product fraction.
  4. Check belt tracking, chute build-up and transfer-point dust.
  5. Verify rotation direction on every motor before coupling.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Sample each product fraction and compare with the specification.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Concrete & Asphalt Recycling Crusher in Pakistan — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

How fast can HAMAC quote for Pakistan?

A flow sheet and budget are normally returned within 24 hours of receiving material, feed size and target capacity.

Is installation support available in Pakistan?

Yes — supervision, commissioning and operator training are part of the standard export scope.

Which wear-part grade should I order?

For concrete & asphalt (low abrasion), Mn13 is a common starting point; HAMAC confirms it in the technical proposal.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call