Overview
HAMAC supplies crushing and grinding equipment to Madagascar, shipped to Toamasina and quoted to local standards (NM). Power is configured for 380V 50Hz.

Crushing equipment for Madagascar
- Popular material: Ilmenite, Graphite.
- Destination port: Toamasina.
- Voltage / frequency: 380V 50Hz.
- Standards: NM.
What HAMAC provides
- Plant design for ilmenite and your capacity.
- Equipment configured to 380V 50Hz and NM.
- FOB / CFR / CIF quotation to Toamasina.
- Installation supervision, training and spare parts.
Logistics & documentation
HAMAC handles packing, container loading plan and the documentation required for Madagascar, including certificates applicable to your market.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Toamasina |
| Site supply | 380V 50Hz |
| Local standards | NM |
| Region | Africa |
| Assumed duty | demolition and recycling duties |
| Evaluation horizon | ten-year view |
At demolition and recycling duties, the ranking of these parameters changes: minimal civil works usually becomes the deciding constraint rather than the headline tonnage.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | demolition and recycling duties |
| Primary objective | minimal civil works |
| Evaluation horizon | ten-year view |
| Site condition | a coastal export terminal |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Review the crusher chamber profile with the liner supplier against the feed material.
- Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
- Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
- Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Book container or flat-rack space to Toamasina and prepare the customs document set in advance.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
A realistic programme reserves time for permits, foundation curing and shipping to Madagascar before any steel is cut.

What to verify before you sign
- Decommissioning or relocation value at the end of a ten-year horizon.
- Closed-side setting range and whether automatic setting regulation is included.
- Nameplate data for 380V 50Hz and the NM certificate set.
- Guaranteed power draw and the minimal civil works trade-off it implies.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
- Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
On demolition and recycling duties, the minimal civil works objective changes which line deserves the most attention during value engineering.
Mistakes that cost more than the machine
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
- Letting the demolition and recycling duties duty be defined verbally instead of in the contract.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a coastal export terminal.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Buying minimal civil works on price alone and losing it in availability.
- Assuming the manufacturer's warranty covers wear parts and consumables.
Review the list with a small contractor crew before the order is placed — they will recognise most of them.
Commissioning checklist
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Record the baseline grading curve for each product fraction.
- Dry-run the plant empty for the specified period and record vibration.
- Verify rotation direction on every motor before coupling.
- Check belt tracking, chute build-up and transfer-point dust.
- Test emergency stops, pull wires and interlock trips in sequence.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
For a small contractor crew, run through this list twice — once with the supervisor and once without.