● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

MTW European Type Grinding Mill for Iran

MTW European Type Grinding Mill supplied to Iran: published model data, 380V 50Hz motors, ISIRI documentation and delivery to Bandar Abbas. HAMAC factory quotation.

Overview

This page brings together the published MTW European Type Grinding Mill model data and the practical details of importing it into Iran — power supply, standards, shipping and commissioning. Popular feed materials in the market include Copper ore, Limestone.

Overview — HAMAC grinding mill reference
Overview — HAMAC grinding mill reference.

Published MTW European Type Grinding Mill data

MTW European Type Grinding Mill nominal technical data
Published parameterNominal value
Quantity of roller (PCS)4 4
Inner diameter of ring (mm)1100 1380
Rotary speed of main frame (r/min)120 96
Max. Feeding size (mm)< 30 < 35
Output size (mm)1.6~0.045 1.6~0.045
Output fineness0.038 0.038

Local conditions in Iran

  • Destination port: Bandar Abbas.
  • Site supply: 380V 50Hz.
  • Standards: ISIRI.
  • Common materials: Copper ore, Limestone.
  • Region: Middle East.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Bandar Abbas, sets motors and starters to 380V 50Hz, and supplies the certificate set applicable to ISIRI. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portBandar Abbas
Site supply380V 50Hz
Local standardsISIRI
RegionMiddle East
Machine lineMTW European Type Grinding Mill
CategoryGrinding Mills
Assumed dutymanufactured-sand production
Evaluation horizonseven-year view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and seven-year operating plan.

Published MTW European Type Grinding Mill model data

MTW European Type Grinding Mill — nominal published data
ItemMTW110MTW138MTW175MTW215
Quantity of roller (PCS)4455
Inner diameter of ring (mm)1100138017502150
Rotary speed of main frame (r/min)120967565
Max. Feeding size (mm)< 30< 35< 40< 50
Output size (mm)1.6~0.0451.6~0.0451.6~0.0451.6-0.055
Output fineness0.0380.0380.0380.045
Capacity (t/h)3.5~106.5~1511~2520-50
Total weight (t)1828.54696

MTW European Tech. grinding mill (Raymond mill) is a national patented product developed by our company on the basis of absorbing European grinding technology and concepts. Read the table column by column against manufactured-sand production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a coastal export terminal in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivesimple operator maintenance
Evaluation horizonseven-year view
Site conditiona coastal export terminal
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for mtw european type grinding mill may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  2. Book container or flat-rack space to Bandar Abbas and prepare the customs document set in advance.
  3. Sequence delivery so foundations cure while the equipment is still in manufacture.
  4. Specify motors, starters and documentation for 380V 50Hz and ISIRI before manufacture.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  8. Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
  9. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC grinding mill reference
From enquiry to the first saleable tonne — HAMAC grinding mill reference.

What to verify before you sign

  • Product sampling points and the lab equipment needed for routine grading checks.
  • Wear-part interchangeability across machines in the same circuit.
  • Control system language, telemetry and remote diagnostics availability.
  • Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
  • Local service partner, technician travel time and visa requirements for Iran.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Liner alloy: Mn13 matched to the rock, not to the lowest purchase price.
  • Guaranteed power draw and the simple operator maintenance trade-off it implies.

For manufactured-sand production, give the simple operator maintenance line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a coastal export terminal.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying simple operator maintenance on price alone and losing it in availability.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.

Review the list with a full-time plant team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Calibrate the belt scale and any level probes against a known load.
  2. Confirm the direction and tension of every belt under no load.
  3. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  4. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  5. Check belt tracking, chute build-up and transfer-point dust.
  6. Hand over the spare-parts list, manuals and maintenance schedule.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Verify rotation direction on every motor before coupling.

The commissioning record becomes the reference for every liner change in the seven-year plan.

MTW European Type Grinding Mill in Iran: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the MTW European Type Grinding Mill be built for 380V 50Hz?

Yes — motors, starters and control panels are specified for 380V 50Hz before manufacture.

Where does HAMAC ship in Iran?

Standard delivery is quoted to Bandar Abbas; an alternative port can be agreed in the contract.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Do you build plants for manufactured-sand production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call