● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PF Impact Crusher for Ghana

PF Impact Crusher supplied to Ghana: published model data, 415V 50Hz motors, GS documentation and delivery to Tema. HAMAC factory quotation.

Overview

This page brings together the published PF Impact Crusher model data and the practical details of importing it into Ghana — power supply, standards, shipping and commissioning. Popular feed materials in the market include Gold ore, Granite.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published PF Impact Crusher data

PF Impact Crusher nominal technical data
Published parameterNominal value
PF-1007Φ1000×700 mm 400×730 mm
PF-1010Φ1000×1050 mm 400×1080 mm
PF-1210Φ1250×1050 mm 400×1080 mm
PF-1214Φ1250×1400 mm 400×1430 mm
PF-1315Φ1320×1500 mm 860×1520 mm
PF-1520Φ1500×2000 mm 830×2040 mm

Local conditions in Ghana

  • Destination port: Tema.
  • Site supply: 415V 50Hz.
  • Standards: GS.
  • Common materials: Gold ore, Granite.
  • Region: Africa.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Tema, sets motors and starters to 415V 50Hz, and supplies the certificate set applicable to GS. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portTema
Site supply415V 50Hz
Local standardsGS
RegionAfrica
Machine linePF Impact Crusher
CategoryImpact Crusher
Assumed dutycontinuous quarry production
Evaluation horizonten-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Published PF Impact Crusher model data

PF Impact Crusher — nominal published data
ModelRotor sizeFeed openingMax. Feeding sizeCapacityMotor PowerWeightOverall dimension
PF-1007Φ1000×700 mm400×730 mm300 mm30-70 t/h37-45 kW12 t2330×1660×2300 mm
PF-1010Φ1000×1050 mm400×1080 mm350 mm50-90 t/h45-55 kW15 t2370×1700×2390 mm
PF-1210Φ1250×1050 mm400×1080 mm350 mm70-130 t/h110 kW17.7 t2680×2160×2800 mm
PF-1214Φ1250×1400 mm400×1430 mm350 mm100-180 t/h132 kW22.4 t2650×2460×2800 mm
PF-1315Φ1320×1500 mm860×1520 mm500 mm130-250 t/h220 kW27 t3180×2720×2620 mm
PF-1520Φ1500×2000 mm830×2040 mm700 mm300-550 t/h315-400 kW50.6 t3959×3564×3330 mm
PF-1620Φ1600×2000 mm2000×1600 mm500 mm400-700 t/h400-500 kW58 t4259×3660×3450 mm
PF-1820Φ1800×2000 mm1260×2040 mm800 mm600-800 t/h630-710 kW83.21 t4400×3866×4009 mm

The impact crusher (impact crusher) is a new generation of impact crusher developed in combination with the specific working conditions of the sand and gravel. Read the table column by column against continuous quarry production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivelowest energy per tonne
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for pf impact crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Plan training for an owner-operator team on CSS adjustment, liner change-out and lock-out / tag-out.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  4. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  5. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  6. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  7. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  8. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  9. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.

Shortening this sequence is possible on a brownfield extension, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Guaranteed power draw and the lowest energy per tonne trade-off it implies.
  • Local service partner, technician travel time and visa requirements for Ghana.
  • Nameplate data for 415V 50Hz and the GS certificate set.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Product sampling points and the lab equipment needed for routine grading checks.

Share this list with an owner-operator team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Overlooking dust, noise and water permits in Ghana until erection has already started.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying lowest energy per tonne on price alone and losing it in availability.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.

Review the list with an owner-operator team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  2. Measure noise and dust at the operator position against the local limit.
  3. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  4. Sample each product fraction and compare with the specification.
  5. Check lubrication levels, grease lines and oil cooler operation.
  6. Record power draw, tonnage and chamber pressure at steady state.
  7. Check belt tracking, chute build-up and transfer-point dust.
  8. Measure and log the as-new CSS / setting for future wear comparison.

The commissioning record becomes the reference for every liner change in the ten-year plan.

PF Impact Crusher in Ghana: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PF Impact Crusher be built for 415V 50Hz?

Yes — motors, starters and control panels are specified for 415V 50Hz before manufacture.

Where does HAMAC ship in Ghana?

Standard delivery is quoted to Tema; an alternative port can be agreed in the contract.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Do you build plants for continuous quarry production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call