Overview
Andesite (Mohs 6, ~170 MPa) is processed in Philippines for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Manila, 380V 60Hz, PNS.

Andesite properties
| Property | Value |
|---|---|
| Mohs | 6 |
| Compressive strength | 170 MPa |
| Abrasion | High |
| Circuit | jaw + cone |
In Philippines
- Port: Manila.
- Power: 380V 60Hz.
- Standards: PNS.
Equipment
- PE Series Jaw Crusher
- HPT Multi-Cylinder Hydraulic Cone Crusher
Budget
Send material, capacity and product sizes for a configured FOB/CIF budget to Manila.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Andesite |
| Mohs hardness | 6 |
| Compressive strength | ~170 MPa |
| Abrasiveness | High |
| Recommended circuit | jaw + cone |
| Destination port | Manila |
| Site supply | 380V 60Hz |
| Local standards | PNS |
| Region | Asia |
| Assumed duty | cement raw-meal preparation |
| Evaluation horizon | five-year view |
Ask for the same table from any competing supplier; without it, an offer for andesite crushing cannot be compared on scope.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | cement raw-meal preparation |
| Primary objective | lowest energy per tonne |
| Evaluation horizon | five-year view |
| Site condition | a brownfield extension |
| Operating team | an owner-operator team |
Change any one of these assumptions and the recommended configuration for andesite crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Specify motors, starters and documentation for 380V 60Hz and PNS before manufacture.
- Plan training for an owner-operator team on CSS adjustment, liner change-out and lock-out / tag-out.
- Confirm the haul-road and stockpile plan with a brownfield extension in mind before fixing conveyor lengths.
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
- Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

What to verify before you sign
- Nameplate data for 380V 60Hz and the PNS certificate set.
- Guaranteed power draw and the lowest energy per tonne trade-off it implies.
- After-sales response time, technician availability and the warranty exclusions in writing.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
- Dust and noise control designed to the local emission limits for Philippines.
- Liner alloy: Mn13 is a common starting point for andesite at high abrasion.
- Product sampling points and the lab equipment needed for routine grading checks.
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
Score each supplier against the same ten items and keep the score sheet with the purchase file for the five-year review.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 50% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 18% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 6% | kWh per tonne, local tariff and dust suppression water |
The weighting shifts with hardness and scale — a high-abrasion feed pushes the wear line up, while a larger plant pushes equipment share up.
Mistakes that cost more than the machine
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Overlooking dust, noise and water permits in Philippines until erection has already started.
- Buying lowest energy per tonne on price alone and losing it in availability.
- Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
Review the list with an owner-operator team before the order is placed — they will recognise most of them.
Commissioning checklist
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Check lubrication levels, grease lines and oil cooler operation.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Sample each product fraction and compare with the specification.
- Verify rotation direction on every motor before coupling.
- Measure and log the as-new CSS / setting for future wear comparison.
- Confirm all guards, emergency stops and pull-wire switches function.
- Check belt tracking, chute build-up and transfer-point dust.
On a brownfield extension, allow extra time for the dust and noise measurements.